Ludlow - Agawam 345 kV — Transmission lineChicopee BESS — Under construction · Storage · MA · 5 MW · 0.8 mi awayStony Brook — Postponed · Gas, combined cycle · MA · 422 MW · 0.8 mi awayPalmer Renewable Energy — Postponed · Biomass · MA · 42 MW · 0.8 mi awayHolyoke MA BESS 1 — Under construction · Storage · MA · 5 MW · 1.3 mi awayRiverside Holyoke — Postponed · Hydro · MA · 1.1 MW · 1.9 mi awayHadley Falls — Postponed · Hydro · MA · 3.5 MW · 2.8 mi awayBelchertown Solar PV + Battery Project — Under construction · Solar + storage · MA · 5.6 MW · 8.2 mi awayCT Airport Authority Solar One — Announced · Solar · CT · 4 MW · 10.9 mi awayWindsor Locks — Under construction · Solar · CT · 1.8 MW · 11.5 mi awayDollar Tree Solar One — Postponed · Solar · CT · 2 MW · 13.0 mi awayBroadleaf Solar — Filed · Solar · CT · 200 MW · 13.7 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Ludlow - Agawam 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-MA

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
17
Substations at the ends (as the source names them)
Ludlow to Agawam
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID113398
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Chicopee BESS Under construction Storage 0.8 mi 5
Stony Brook Postponed Gas, combined cycle 0.8 mi 422
Palmer Renewable Energy Postponed Biomass 0.8 mi 42
Holyoke MA BESS 1 Under construction Storage 1.3 mi 5
Riverside Holyoke Postponed Hydro 1.9 mi 1.1
Hadley Falls Postponed Hydro 2.8 mi 3.5
Belchertown Solar PV + Battery Project Under construction Solar + storage 8.2 mi 5.6
CT Airport Authority Solar One Announced Solar 10.9 mi 4
Windsor Locks Under construction Solar 11.5 mi 1.8
Dollar Tree Solar One Postponed Solar 13.0 mi 2
Broadleaf Solar Filed Solar 13.7 mi 200

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution