Ludlow - Barbour Hill 345 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 345 kV
- States crossed
- US-CT, US-MA
- Owner (as stated)
- Connecticut Light Power
Details
Who’s behind it
- Owner
- Connecticut Light Power
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 26
- Substations at the ends (as the source names them)
- Ludlow to Barbour Hill
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | connecticut light power |
| HIFLD line ID | 124266 |
| Voltage class | 345 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Ellington Solar One Postponed | Solar | 0.2 mi | 2 |
| Stony Brook Postponed | Gas, combined cycle | 3.3 mi | 422 |
| Palmer Renewable Energy Postponed | Biomass | 4.6 mi | 42 |
| Riverside Holyoke Postponed | Hydro | 7.5 mi | 1.1 |
| Hadley Falls Postponed | Hydro | 8.1 mi | 3.5 |
| Chicopee BESS Under construction | Storage | 8.2 mi | 5 |
| Belchertown Solar PV + Battery Project Under construction | Solar + storage | 8.2 mi | 5.6 |
| CT Airport Authority Solar One Announced | Solar | 8.5 mi | 4 |
| Windsor Locks Under construction | Solar | 9.2 mi | 1.8 |
| Hartford Hospital Cogeneration Postponed | Gas, combustion turbine | 9.8 mi | 11.5 |
| Holyoke MA BESS 1 Under construction | Storage | 10.0 mi | 5 |
| Homestead Fuel Cell Postponed | Gas, other | 10.2 mi | 8.4 |
| Willington Solar One, LLC Under construction | Solar | 10.5 mi | 2 |
| Dollar Tree Solar One Postponed | Solar | 10.6 mi | 2 |
| NU - WETHERSFIELD DATA CENTER Built | Large load | 12.0 mi | |
| Broadleaf Solar Filed | Solar | 13.9 mi | 200 |
Sources EIA-860M · EPA ICIS-Air