Macys Goodyear: location and 21 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Macys Goodyear
Power plant · Solar
Key facts
Power plant · Solarran 11% of 2024 Retiring- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2010
- Net generation, 2024
- 3,097 MWh
- Grid
- 0.5 kV to Arizona Public Service Co (AZPS)
- Location
- Maricopa County, Arizona
- Operated by
- Macys Corporate Services, IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 16 years since 2010
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Balancing authority code | AZPS |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 6.7
- AC capacity (MW)
- 3.1
- DC capacity (MW)
- 3.5
- Mounting
- Single-axis tracking
- Site type
- Greenfield
- Began operating
- 2010
Retirement
EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.- Next scheduled retirement
- December 2035
- Capacity scheduled to retire
- 3.1 MW
- Generators scheduled to retire
- 1
- Share of in-service capacity scheduled
- 100%
- Capacity still in service
- 3.1 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 3.1 MW | Scheduled to retire | December 2035 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 0 kV
- Transmission or distribution system owner
- Arizona Public Service Co
- Balancing authority
- Arizona Public Service Company
- NERC region
- WECC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 1 scheduled to retire, 3.1 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · LBNL · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Vantage Data Center 21 Under construction | Large load | 2.6 mi | |
| PHX16 Data Center Filed | Large load | 2.8 mi | |
| COMPASS DATA CENTER - MOONRAKER Built | Large load | 3.1 mi | |
| Stream Data Center Built | Large load | 3.2 mi | |
| COMPASS DATACENTERS PHX I Built | Large load | 3.2 mi | |
| Crane (Avondale data centre) Filed | Large load | 3.4 mi | |
| Vantage AZ15 Under construction | Large load | 3.6 mi | |
| PHX73 (Goodyear data centre) Filed | Large load | 5.7 mi | |
| MICROSOFT CORP - CITRUS RD Built | Large load | 5.9 mi | |
| PHX 70 - MICROSOFT DATA CENTER Built | Large load | 5.9 mi | |
| Prime Data Center Under construction | Large load | 6.1 mi | |
| Sierra Luna Energy Storage Announced | Storage | 6.4 mi | 150 |
| QTS PHX3 Data Center Built | Large load | 7.2 mi | |
| QTS DC13 - Temp Crane - NE Filed | Large load | 7.8 mi | |
| QTS DATA CENTER Under construction | Large load | 8.0 mi | |
| White Tank Energy Storage Under construction | Storage | 8.3 mi | 100 |
| MERIT 2 Built | Large load | 10.7 mi | |
| Aligned Phx 7 Filed | Large load | 10.8 mi | |
| Microsoft Phx 83 (El Mirage data centre) Filed | Large load | 11.3 mi | |
| MICROSOFT CORP - OLIVE AVE Built | Large load | 11.7 mi | |
| Compass Datacenter Under construction | Large load | 12.5 mi |