Macys Goodyear — Power plant · Solar · Macys Corporate Services, IncVantage Data Center 21 — Under construction · Large load · AZ · 2.6 mi awayPHX16 Data Center — Filed · Large load · AZ · 2.8 mi awayCOMPASS DATA CENTER - MOONRAKER — Built · Large load · AZ · 3.1 mi awayStream Data Center — Built · Large load · AZ · 3.2 mi awayCOMPASS DATACENTERS PHX I — Built · Large load · AZ · 3.2 mi awayCrane (Avondale data centre) — Filed · Large load · AZ · 3.4 mi awayVantage AZ15 — Under construction · Large load · AZ · 3.6 mi awayPHX73 (Goodyear data centre) — Filed · Large load · AZ · 5.7 mi awayMICROSOFT CORP - CITRUS RD — Built · Large load · AZ · 5.9 mi awayPHX 70 - MICROSOFT DATA CENTER — Built · Large load · AZ · 5.9 mi awayPrime Data Center — Under construction · Large load · AZ · 6.1 mi awaySierra Luna Energy Storage — Announced · Storage · AZ · 150 MW · 6.4 mi awayQTS PHX3 Data Center — Built · Large load · AZ · 7.2 mi awayQTS DC13 - Temp Crane - NE — Filed · Large load · AZ · 7.8 mi awayQTS DATA CENTER — Under construction · Large load · AZ · 8.0 mi awayWhite Tank Energy Storage — Under construction · Storage · AZ · 100 MW · 8.3 mi awayMERIT 2 — Built · Large load · AZ · 10.7 mi awayAligned Phx 7 — Filed · Large load · AZ · 10.8 mi awayMicrosoft Phx 83 (El Mirage data centre) — Filed · Large load · AZ · 11.3 mi awayMICROSOFT CORP - OLIVE AVE — Built · Large load · AZ · 11.7 mi awayCompass Datacenter — Under construction · Large load · AZ · 12.5 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Macys Goodyear

Power plant · Solar

Key facts

Power plant · Solarran 11% of 2024 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2010
Net generation, 2024
3,097 MWh
Grid
0.5 kV to Arizona Public Service Co (AZPS)
Location
Maricopa County, Arizona
Operated by
Macys Corporate Services, IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2011 to 2024

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
16 years since 2010
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000816591
Location id
L100000813860
Eia plant ids
57673
Balancing authority codeAZPS

Solar arrays

Array area (acres)
6.7
AC capacity (MW)
3.1
DC capacity (MW)
3.5
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2010

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
December 2035
Capacity scheduled to retire
3.1 MW
Generators scheduled to retire
1
Share of in-service capacity scheduled
100%
Capacity still in service
3.1 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Solar Photovoltaic3.1 MWScheduled to retireDecember 2035

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
0 kV
Transmission or distribution system owner
Arizona Public Service Co
Balancing authority
Arizona Public Service Company
NERC region
WECC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 1 scheduled to retire, 3.1 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Vantage Data Center 21 Under construction Large load 2.6 mi
PHX16 Data Center Filed Large load 2.8 mi
COMPASS DATA CENTER - MOONRAKER Built Large load 3.1 mi
Stream Data Center Built Large load 3.2 mi
COMPASS DATACENTERS PHX I Built Large load 3.2 mi
Crane (Avondale data centre) Filed Large load 3.4 mi
Vantage AZ15 Under construction Large load 3.6 mi
PHX73 (Goodyear data centre) Filed Large load 5.7 mi
MICROSOFT CORP - CITRUS RD Built Large load 5.9 mi
PHX 70 - MICROSOFT DATA CENTER Built Large load 5.9 mi
Prime Data Center Under construction Large load 6.1 mi
Sierra Luna Energy Storage Announced Storage 6.4 mi 150
QTS PHX3 Data Center Built Large load 7.2 mi
QTS DC13 - Temp Crane - NE Filed Large load 7.8 mi
QTS DATA CENTER Under construction Large load 8.0 mi
White Tank Energy Storage Under construction Storage 8.3 mi 100
MERIT 2 Built Large load 10.7 mi
Aligned Phx 7 Filed Large load 10.8 mi
Microsoft Phx 83 (El Mirage data centre) Filed Large load 11.3 mi
MICROSOFT CORP - OLIVE AVE Built Large load 11.7 mi
Compass Datacenter Under construction Large load 12.5 mi

Sources EPA ICIS-NPDES · FAA OE/AAA · EPA ICIS-Air · EIA-860M