Show on map
Matrix Buildings A&B (Perth Amboy) Solar — Power plant · Solar · Public Service Elec & Gas CoElevate Arthur Kill — Under construction · Storage · NY · 15.1 MW · 5.4 mi awaySwiftsure — Postponed · Storage · NY · 121 MW · 6.2 mi awayGateway Energy Center, LLC — Postponed · Gas, combined cycle · NJ · 440 MW · 7.5 mi awayBARCLAYS CAPITAL DATA CENTER — Built · Large load · NJ · 7.6 mi awayMiddlesex Energy Center LLC — Postponed · Gas, combined cycle · NJ · 570 MW · 7.6 mi awayCoreweave — Under construction · Large load · NJ · 9.7 mi awayBARCLAYS CAPITAL DATA CENTER — Built · Large load · NJ · 10.0 mi awayEVOQUE DATA CENTER SOLUTIONS - PNJ1 — Built · Large load · NJ · 10.1 mi awayMilltown Onsite BESS — Under construction · Storage · NJ · 13.2 MW · 10.3 mi awayBPL NJ - Union Distribution Center — Under construction · Solar · NJ · 1.5 MW · 10.4 mi awayPrologis - SLNNJ036 - Community Solar — Under construction · Solar · NJ · 1.6 MW · 10.4 mi awayStaten Island Energy Storage 1 LLC — Postponed · Storage · NY · 5 MW · 10.8 mi awayElizabeth Metropolitan Logistics Center — Under construction · Solar · NJ · 1.2 MW · 10.9 mi awayNJ 1 DATA CENTER — Built · Large load · NJ · 11.4 mi awayAB Newark Solar — Postponed · Solar · NJ · 5.6 MW · 12.0 mi awayPrologis - SLCNJ001 - Community Solar — Under construction · Solar · NJ · 3.2 MW · 12.0 mi awayBayonne Energy Center — Under construction · Storage · NJ · 49.8 MW · 12.4 mi awayFIDESSA — Built · Large load · NJ · 14.1 mi awayMORGAN STANLEY DATA CENTER — Built · Large load · NJ · 14.3 mi awayBPL NJ - Belmont — Under construction · Solar · NJ · 1.8 MW · 14.4 mi away
  • Wind & solar
  • Storage
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Matrix Buildings A&B (Perth Amboy) Solar

Power plant · Solar

Key facts

Power plant · Solarran 6% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2011
Net generation, 2025
1,373 MWh
Grid
13 kV to Public Service Elec & Gas Co (PJM)
Location
Middlesex County, New Jersey
Operated by
Public Service Elec & Gas CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2011 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
15 years since 2011
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000816650
Location id
L100000813914
Eia plant ids
57384
Fuel burned (MMBtu), 20254,684
Capacity factor, 20250.063
Net generation (MWh), 20251,373
Balancing authority codePJM

Solar arrays

Array area (acres)
8.8
AC capacity (MW)
2.5
DC capacity (MW)
2.9
Mounting
Fixed tilt
Site type
Previous, current or suspected contamination
Began operating
2011

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
December 2031
Capacity scheduled to retire
2.5 MW
Generators scheduled to retire
1
Share of in-service capacity scheduled
100%
Capacity still in service
2.5 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
MATRSolar Photovoltaic2.5 MWScheduled to retireDecember 2031

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
13 kV
Transmission or distribution system owner
Public Service Elec & Gas Co
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit MATR scheduled to retire, 2.5 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Elevate Arthur Kill Under construction Storage 5.4 mi 15.1
Swiftsure Postponed Storage 6.2 mi 121
Gateway Energy Center, LLC Postponed Gas, combined cycle 7.5 mi 440
BARCLAYS CAPITAL DATA CENTER Built Large load 7.6 mi
Middlesex Energy Center LLC Postponed Gas, combined cycle 7.6 mi 570
Coreweave Under construction Large load 9.7 mi
BARCLAYS CAPITAL DATA CENTER Built Large load 10.0 mi
EVOQUE DATA CENTER SOLUTIONS - PNJ1 Built Large load 10.1 mi
Milltown Onsite BESS Under construction Storage 10.3 mi 13.2
BPL NJ - Union Distribution Center Under construction Solar 10.4 mi 1.5
Prologis - SLNNJ036 - Community Solar Under construction Solar 10.4 mi 1.6
Staten Island Energy Storage 1 LLC Postponed Storage 10.8 mi 5
Elizabeth Metropolitan Logistics Center Under construction Solar 10.9 mi 1.2
NJ 1 DATA CENTER Built Large load 11.4 mi
AB Newark Solar Postponed Solar 12.0 mi 5.6
Prologis - SLCNJ001 - Community Solar Under construction Solar 12.0 mi 3.2
Bayonne Energy Center Under construction Storage 12.4 mi 49.8
FIDESSA Built Large load 14.1 mi
MORGAN STANLEY DATA CENTER Built Large load 14.3 mi
BPL NJ - Belmont Under construction Solar 14.4 mi 1.8

Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA

Sources

Attribution