Matrix Buildings A&B (Perth Amboy) Solar: location and 20 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Matrix Buildings A&B (Perth Amboy) Solar
Power plant · Solar
Key facts
Power plant · Solarran 6% of 2025 Retiring- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2011
- Net generation, 2025
- 1,373 MWh
- Grid
- 13 kV to Public Service Elec & Gas Co (PJM)
- Location
- Middlesex County, New Jersey
- Operated by
- Public Service Elec & Gas CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 15 years since 2011
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Fuel burned (MMBtu), 2025 | 4,684 |
| Capacity factor, 2025 | 0.063 |
| Net generation (MWh), 2025 | 1,373 |
| Balancing authority code | PJM |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 8.8
- AC capacity (MW)
- 2.5
- DC capacity (MW)
- 2.9
- Mounting
- Fixed tilt
- Site type
- Previous, current or suspected contamination
- Began operating
- 2011
Retirement
EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.- Next scheduled retirement
- December 2031
- Capacity scheduled to retire
- 2.5 MW
- Generators scheduled to retire
- 1
- Share of in-service capacity scheduled
- 100%
- Capacity still in service
- 2.5 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| MATR | Solar Photovoltaic | 2.5 MW | Scheduled to retire | December 2031 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 13 kV
- Transmission or distribution system owner
- Public Service Elec & Gas Co
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit MATR scheduled to retire, 2.5 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · LBNL · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Elevate Arthur Kill Under construction | Storage | 5.4 mi | 15.1 |
| Swiftsure Postponed | Storage | 6.2 mi | 121 |
| Gateway Energy Center, LLC Postponed | Gas, combined cycle | 7.5 mi | 440 |
| BARCLAYS CAPITAL DATA CENTER Built | Large load | 7.6 mi | |
| Middlesex Energy Center LLC Postponed | Gas, combined cycle | 7.6 mi | 570 |
| Coreweave Under construction | Large load | 9.7 mi | |
| BARCLAYS CAPITAL DATA CENTER Built | Large load | 10.0 mi | |
| EVOQUE DATA CENTER SOLUTIONS - PNJ1 Built | Large load | 10.1 mi | |
| Milltown Onsite BESS Under construction | Storage | 10.3 mi | 13.2 |
| BPL NJ - Union Distribution Center Under construction | Solar | 10.4 mi | 1.5 |
| Prologis - SLNNJ036 - Community Solar Under construction | Solar | 10.4 mi | 1.6 |
| Staten Island Energy Storage 1 LLC Postponed | Storage | 10.8 mi | 5 |
| Elizabeth Metropolitan Logistics Center Under construction | Solar | 10.9 mi | 1.2 |
| NJ 1 DATA CENTER Built | Large load | 11.4 mi | |
| AB Newark Solar Postponed | Solar | 12.0 mi | 5.6 |
| Prologis - SLCNJ001 - Community Solar Under construction | Solar | 12.0 mi | 3.2 |
| Bayonne Energy Center Under construction | Storage | 12.4 mi | 49.8 |
| FIDESSA Built | Large load | 14.1 mi | |
| MORGAN STANLEY DATA CENTER Built | Large load | 14.3 mi | |
| BPL NJ - Belmont Under construction | Solar | 14.4 mi | 1.8 |
Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA