Show on map
MER Queens — Power plant · Gas, other · Bloom EnergyRoseate Tern Clean Energy LLC — Under construction · Storage · NY · 3.3 MW · 1.5 mi awayAstoria Gas Turbines — Postponed · Gas, combustion turbine · NY · 431 MW · 4.0 mi awayRavenswood — Postponed · Storage · NY · 316 MW · 4.3 mi awayBlue Aster B Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 4.5 mi awayBlue Aster Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 4.5 mi awayBlue Aster C Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 4.5 mi awayLinden Clean Energy, LLC — Under construction · Storage · NY · 3.7 MW · 4.7 mi awayCoral Honeysuckle Clean Energy LLC — Under construction · Storage · NY · 3.7 MW · 4.7 mi awayNew York University Central Plant — Under construction · Gas, combined cycle · NY · 5.5 MW · 4.7 mi awayWater Willow A Clean Energy LLC — Under construction · Storage · NY · 3.9 MW · 5.1 mi awayWater Willow B Clean Energy LLC — Under construction · Storage · NY · 3.9 MW · 5.1 mi awayWintergreen C Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 5.5 mi awayWintergreen B Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 5.5 mi awayWintergreen D Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 5.5 mi awayWintergreen Clean Energy, LLC — Under construction · Storage · NY · 4.9 MW · 5.5 mi awayNISA Electric Generation Project — Permitted · Storage · NY · 300 MW · 5.5 mi awayNISA Electric Generation Project — Postponed · Gas, combined cycle · NY · 92.5 MW · 5.5 mi awayPiping Plover Clean Energy, LLC — Under construction · Storage · NY · 2.3 MW · 5.6 mi awayWarbler Clean Energy LLC — Under construction · Storage · NY · 2.3 MW · 5.6 mi awayLincoln Medical and Mental Health Center — Under construction · Oil · NY · 1 MW · 6.3 mi awayJamaica Community Energy, LLC — Under construction · Storage · NY · 4.9 MW · 7.3 mi awayCDIL DATA CENTRE USA LLC — Built · Large load · NY · 7.3 mi awayBensonhurst Energy Storage 1 LLC — Under construction · Storage · NY · 5 MW · 7.5 mi awayKennedy International Airport Cogen — Postponed · Gas, combustion turbine · NY · 50 MW · 8.1 mi awayLobelia Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 8.3 mi awayLobelia 4452 Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 8.3 mi awayCYXTERA - NJ2X — Built · Large load · NJ · 8.3 mi awayGowanus Gas Turbines Generating — Postponed · Gas, combustion turbine · NY · 93 MW · 8.6 mi awayHeron Clean Energy, LLC — Under construction · Storage · NY · 4.9 MW · 8.7 mi awayCORESITE NY4 DATA CENTER — Under construction · Large load · NJ · 10.6 mi awayEastern BlueBird Clean Energy LLC — Under construction · Storage · NY · 4.4 MW · 10.6 mi awayNorthern Cardinal Clean Energy, LLC — Under construction · Storage · NY · 4.4 MW · 10.6 mi awayEQUINIX — Built · Large load · NJ · 10.7 mi awayEQUINIX LLC — Built · Large load · NJ · 10.9 mi awayNJ TRANSITGRID — Postponed · Gas, combustion turbine · NJ · 136.1 MW · 11.5 mi awayBayonne Energy Center — Under construction · Storage · NJ · 49.8 MW · 12.9 mi awayHecate Grid Intrepid — Postponed · Storage · NY · 300 MW · 14.0 mi awayRAR DEVELOPMENT ASSOCIATES — Built · Large load · NJ · 14.2 mi awayRAR DEVELOPMENT ASSOCIATES — Built · Large load · NJ · 14.3 mi awayStaten Island Energy Storage 1 LLC — Postponed · Storage · NY · 5 MW · 14.4 mi away
  • Combustion
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, other

Key facts

Power plant · Gas, otherran 94% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2017
Net generation, 2025
9,890 MWh
Grid
12 kV to Consolidated Edison Co-NY Inc (NYIS)
Location
Queens County, New York
Operated by
Bloom Energy

Output

Net generation MWh by year, 2018 to 2025
Fuel burned MMBtu by year, 2018 to 2025
  • Gas

Operations detail

Details

Who’s behind it

Owner
KeyBank

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, other source: “Other Natural Gas”
Age
9 years since 2017
Heat rate
7,030 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
12
Transmission owner
Consolidated Edison Co-NY Inc
Balancing authority code
NYIS
Balancing authority name
New York Independent System Operator
Fuel burned (MMBtu), 202569,530
Capacity factor, 20250.941
Heat rate (Btu/kWh), 20257,030.3
Net generation (MWh), 20259,890
Balancing authority codeNYIS

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Bloom Energy Operator EIA-860M
KeyBank Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Roseate Tern Clean Energy LLC Under construction Storage 1.5 mi 3.3
Astoria Gas Turbines Postponed Gas, combustion turbine 4.0 mi 431
Ravenswood Postponed Storage 4.3 mi 316
Blue Aster B Clean Energy LLC Under construction Storage 4.5 mi 4.9
Blue Aster Clean Energy LLC Under construction Storage 4.5 mi 4.9
Blue Aster C Clean Energy LLC Under construction Storage 4.5 mi 4.9
Linden Clean Energy, LLC Under construction Storage 4.7 mi 3.7
Coral Honeysuckle Clean Energy LLC Under construction Storage 4.7 mi 3.7
New York University Central Plant Under construction Gas, combined cycle 4.7 mi 5.5
Water Willow A Clean Energy LLC Under construction Storage 5.1 mi 3.9
Water Willow B Clean Energy LLC Under construction Storage 5.1 mi 3.9
Wintergreen C Clean Energy LLC Under construction Storage 5.5 mi 4.9
Wintergreen B Clean Energy LLC Under construction Storage 5.5 mi 4.9
Wintergreen D Clean Energy LLC Under construction Storage 5.5 mi 4.9
Wintergreen Clean Energy, LLC Under construction Storage 5.5 mi 4.9
NISA Electric Generation Project × 2 units Permitted Storage 5.5 mi 392.5
Piping Plover Clean Energy, LLC Under construction Storage 5.6 mi 2.3
Warbler Clean Energy LLC Under construction Storage 5.6 mi 2.3
Lincoln Medical and Mental Health Center Under construction Oil 6.3 mi 1
Jamaica Community Energy, LLC Under construction Storage 7.3 mi 4.9
CDIL DATA CENTRE USA LLC Built Large load 7.3 mi
Bensonhurst Energy Storage 1 LLC Under construction Storage 7.5 mi 5
Kennedy International Airport Cogen Postponed Gas, combustion turbine 8.1 mi 50
Lobelia Clean Energy LLC Under construction Storage 8.3 mi 4.9
Lobelia 4452 Clean Energy LLC Under construction Storage 8.3 mi 4.9
CYXTERA - NJ2X Built Large load 8.3 mi
Gowanus Gas Turbines Generating Postponed Gas, combustion turbine 8.6 mi 93
Heron Clean Energy, LLC Under construction Storage 8.7 mi 4.9
CORESITE NY4 DATA CENTER Under construction Large load 10.6 mi
Eastern BlueBird Clean Energy LLC Under construction Storage 10.6 mi 4.4
Northern Cardinal Clean Energy, LLC Under construction Storage 10.6 mi 4.4
EQUINIX Built Large load 10.7 mi
EQUINIX LLC Built Large load 10.9 mi
NJ TRANSITGRID Postponed Gas, combustion turbine 11.5 mi 136.1
Bayonne Energy Center Under construction Storage 12.9 mi 49.8
Hecate Grid Intrepid Postponed Storage 14.0 mi 300
RAR DEVELOPMENT ASSOCIATES × 2 units Built Large load 14.2 mi
Staten Island Energy Storage 1 LLC Postponed Storage 14.4 mi 5

Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES

Sources

Attribution