Polk
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 34% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1996
- Net generation, 2025
- 4,288,930 MWh
- Grid
- 230 kV to Tampa Electric Co (TEC)
- Location
- Polk County, Florida
- Operated by
- Tampa Electric Co
Output
- Gas
- Coal
- Oil
Details
Who’s behind it
- Owner
- TECO Energy Inc
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Age
- 30 years since 1996
- Unused energy
- 8,484 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 7,534 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 32,313,196 |
| Capacity factor, 2025 | 0.336 |
| Heat rate (Btu/kWh), 2025 | 7,534.1 |
| Net generation (MWh), 2025 | 4,288,930.0 |
| Balancing authority code | TEC |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 133.4 MW
- Generators retired
- 1
- Capacity still in service
- 1,458.2 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1CA | Natural Gas Fired Combined Cycle | 133.4 MW | Retired | March 2025 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 230 kV
- Transmission or distribution system owner
- Tampa Electric Co
- Balancing authority
- Tampa Electric Company
- NERC region
- SERC
Transmission lines within 25 km (10)
- Pebbledale 230 kV line
- Pebbledale 230 kV line
- Hardee Power Station 230 kV line
- 230 kV line 179699
- Hardee Power Station - Midulla Generating Station 230 kV
- Hardee Power Station - Midulla Generating Station 230 kV
- Hardee Power Station - Vandolah 230 kV
- Hardee Power Station - Vandolah 230 kV
- Hines Energy Complex 230 kV line
- Hines Energy Complex - Fort Meade 230 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Tampa Electric Co | Operator | EIA-860M | ||
| TECO ENERGY INC | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- Stated Unit 1CA scheduled to retire, 133.4 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Polk Postponed | Gas, combined cycle | 0.0 km | 1,858.8 |
| Brewster Solar Under construction | Solar | 3.1 km | 40 |
| Midulla Generating Station Postponed | Oil | 10.0 km | 555 |
| Tide Bay Postponed | Solar | 12.7 km | 74.9 |
| Hines Energy Complex Postponed | Gas, combined cycle | 13.5 km | 1,034 |
| Unknown Postponed | Oil | 18.1 km | 1,560 |
| Mattaniah Solar Under construction | Solar | 19.1 km | 52 |