Show on map
Polk — Power plant · Gas, combined cycle · Tampa Electric CoPolk — Gas, combined cycle · FL · 1,858.8 MW · 0.0 km awayBrewster Solar — Solar · FL · 40 MW · 3.1 km awayMidulla Generating Station — Oil · FL · 555 MW · 10.0 km awayTide Bay — Solar · FL · 74.9 MW · 12.7 km awayHines Energy Complex — Gas, combined cycle · FL · 1,034 MW · 13.5 km awayUnknown — Oil · FL · 1,560 MW · 18.1 km awayMattaniah Solar — Solar · FL · 52 MW · 19.1 km away
  • Combustion
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 34% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1996
Net generation, 2025
4,288,930 MWh
Grid
230 kV to Tampa Electric Co (TEC)
Location
Polk County, Florida

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
30 years since 1996
Unused energy
8,484 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
7,534 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000365113
Subparts reported
D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001100
Fuel burned (MMBtu), 202532,313,196
Capacity factor, 20250.336
Heat rate (Btu/kWh), 20257,534.1
Net generation (MWh), 20254,288,930.0
Balancing authority codeTEC

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
133.4 MW
Generators retired
1
Capacity still in service
1,458.2 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1CANatural Gas Fired Combined Cycle133.4 MWRetiredMarch 2025

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
230 kV
Transmission or distribution system owner
Tampa Electric Co
Balancing authority
Tampa Electric Company
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Tampa Electric Co Operator EIA-860M
TECO ENERGY INC Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Unit 1CA scheduled to retire, 133.4 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Polk Postponed Gas, combined cycle 0.0 km 1,858.8
Brewster Solar Under construction Solar 3.1 km 40
Midulla Generating Station Postponed Oil 10.0 km 555
Tide Bay Postponed Solar 12.7 km 74.9
Hines Energy Complex Postponed Gas, combined cycle 13.5 km 1,034
Unknown Postponed Oil 18.1 km 1,560
Mattaniah Solar Under construction Solar 19.1 km 52

Sources EIA-860M

Sources

Attribution