Show on map
Rio Bravo Poso 115 kV line — Transmission lineKern Front — Postponed · Solar · CA · 18.9 MW · 3.1 mi awayRanch 4220 — Under construction · Solar · CA · 1.1 MW · 3.9 mi awayLerdo Middle — Under construction · Solar · CA · 2.4 MW · 5.3 mi awayImperator Solar — Under construction · Solar · CA · 2 MW · 5.9 mi awayNorth Kern Water Storage District 2 — Postponed · Solar · CA · 2.5 MW · 6.7 mi awayBakersfield Driver — Under construction · Solar + storage · CA · 2 MW · 6.8 mi awayNorth Kern Water Storage District 1 — Postponed · Solar · CA · 2.5 MW · 7.2 mi awayRanch 4701 — Under construction · Solar · CA · 2.3 MW · 11.5 mi awaySolar Photovoltaic Project #35 — Postponed · Solar · CA · 7 MW · 14.2 mi awaySolar Photovoltaic Project #46 — Postponed · Solar · CA · 3.5 MW · 14.4 mi away
  • Wind & solar
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Rio Bravo Poso 115 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
115 kV
States crossed
US-CA
Owner (as stated)
Pacific Gas Electric

Details

Who’s behind it

Owner
Pacific Gas Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
7
Substations at the ends (as the source names them)
Rio Bravo Poso
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpacific gas electric
HIFLD line ID311328
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Kern Front Postponed Solar 3.1 mi 18.9
Ranch 4220 Under construction Solar 3.9 mi 1.1
Lerdo Middle Under construction Solar 5.3 mi 2.4
Imperator Solar Under construction Solar 5.9 mi 2
North Kern Water Storage District 2 Postponed Solar 6.7 mi 2.5
Bakersfield Driver Under construction Solar + storage 6.8 mi 2
North Kern Water Storage District 1 Postponed Solar 7.2 mi 2.5
Ranch 4701 Under construction Solar 11.5 mi 2.3
Solar Photovoltaic Project #35 Postponed Solar 14.2 mi 7
Solar Photovoltaic Project #46 Postponed Solar 14.4 mi 3.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution