River Rouge — Power plant · Coal · DTE Electric CompanyEast Windsor cogeneration centre 2 — Under construction · Gas, combustion turbine · Canada · 100 MW · 6.7 mi awayCity of Detroit Greenfield — Permitted · Solar · MI · 7 MW · 10.2 mi awayCity of Detroit Castle Solar — Under construction · Solar · MI · 10 MW · 10.6 mi awayTrenton Channel Energy Center — Under construction · Storage · MI · 220 MW · 11.0 mi away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

River Rouge

Power plant · Coal

Key facts

Power plant · Coal Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1956
Net generation, 2023
-14 MWh
Grid
120 kV to ITC Transmission (MISO)
Location
Wayne County, Michigan

Output

Net generation MWh by year, 2001 to 2024
Fuel burned MMBtu by year, 2001 to 2024
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
70 years since 1956
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
DTE Energy Co
Share pct
100
Gem entity id
E100002004748
Unit ids
G100000108588, G100000108589
Location id
L100000103987
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000406917
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000677
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
January 2024
First unit retired
June 2016
Capacity retired
944 MW
Generators retired
7
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
2Conventional Steam Coal292.5 MWRetiredJune 2016
1Natural Gas Steam Turbine282.6 MWRetiredDecember 2016
3Conventional Steam Coal358.1 MWRetiredMay 2021
IC1Petroleum Liquids2.7 MWRetiredJanuary 2024
IC2Petroleum Liquids2.7 MWRetiredJanuary 2024
IC3Petroleum Liquids2.7 MWRetiredJanuary 2024
IC4Petroleum Liquids2.7 MWRetiredJanuary 2024
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Conventional Steam Coal650.6 MW
Natural Gas Steam Turbine282.6 MW
Petroleum Liquids10.8 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
120 kV
Transmission or distribution system owner
ITC Transmission
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

3 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
DTE Electric Company Operator EIA-860M
DTE ENERGY CO Owner 100.0% Dec 31, 2023 EPA GHGRP
DTE Energy Services Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • Stated Units IC1, IC2, IC3, IC4 scheduled to retire, 10.8 MW · EIA-860M
  • Stated Unit 3 scheduled to retire, 358.1 MW · EIA-860M
  • Stated Unit 1 scheduled to retire, 282.6 MW · EIA-860M
  • Stated Unit 2 scheduled to retire, 292.5 MW · EIA-860M
  • In service · EIA-860M

Sources

7 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
East Windsor cogeneration centre 2 Under construction Gas, combustion turbine 6.7 mi 100
City of Detroit Greenfield Permitted Solar 10.2 mi 7
City of Detroit Castle Solar Under construction Solar 10.6 mi 10
Trenton Channel Energy Center Under construction Storage 11.0 mi 220

Sources GEM · EIA-860M · Berkeley Lab

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.

Attribution