Show on map
Sherwood H Smith Jr Energy Complex — Power plant · Gas, combined cycle · Duke Energy Progress - (NC)AMAZON DATA SERVICES, INC. - ENERGY WAY TECH CAMPUS — Built · Large load · NC · 0.7 mi awayGum Swamp Solar, LLC — Under construction · Solar · NC · 80 MW · 8.3 mi awayLonghorn Holdings — Postponed · Solar · NC · 5 MW · 11.5 mi awayFriesian Holdings — Postponed · Solar · NC · 75 MW · 14.2 mi away
  • Combustion
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Sherwood H Smith Jr Energy Complex

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 50% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2001
Net generation, 2025
9,853,136 MWh
Grid
230 kV to Duke Energy Progress - (NC) (CPLE)
Location
Richmond County, North Carolina

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
25 years since 2001
Unused energy
9,811 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
8,078 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
230
Transmission owner
Duke Energy Progress - (NC)
Balancing authority code
CPLE
Balancing authority name
Duke Energy Progress East
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110004060417
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001150
Fuel burned (MMBtu), 202579,593,266
Capacity factor, 20250.501
Heat rate (Btu/kWh), 20258,078
Net generation (MWh), 20259,853,136.0
Balancing authority codeCPLE

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Duke Energy Progress - (NC) Operator EIA-860M
Duke Energy Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AMAZON DATA SERVICES, INC. - ENERGY WAY TECH CAMPUS Built Large load 0.7 mi
Gum Swamp Solar, LLC Under construction Solar 8.3 mi 80
Longhorn Holdings Postponed Solar 11.5 mi 5
Friesian Holdings Postponed Solar 14.2 mi 75

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution