- Combustion
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Retired
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Retired
Starbucks - Evolution Fresh: location and 20 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Starbucks - Evolution Fresh
Power plant · Gas, other
Key facts
Power plant · Gas, otherran 16% of 2024 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2014
- Net generation, 2024
- 1,509 MWh
- Grid
- 12 kV to Rancho Cucamonga Municipal Utility (CISO)
- Location
- San Bernardino County, California
- Operated by
- Bloom Energy
Output
- Gas
Details
Who’s behind it
- Owner
- Starbucks
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, other source: “Other Natural Gas”
- Age
- 12 years since 2014
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | CISO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- June 2024
- Capacity retired
- 1.1 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| SBK00 | Other Natural Gas | 1.1 MW | Retired | June 2024 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 12 kV
- Transmission or distribution system owner
- Rancho Cucamonga Municipal Utility
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Bloom Energy | Operator | EIA-860M | ||
| Starbucks | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
Timeline
- Stated Unit SBK00 scheduled to retire, 1.1 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- CAISOSource: California ISO
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Solar Photovoltaic Project #31 Postponed | Solar | 1.0 mi | 1 |
| Solar Photovoltaic Project #21 Postponed | Solar | 1.3 mi | 2.5 |
| Solar Photovoltaic Project #23 Postponed | Solar | 2.0 mi | 0.5 |
| Solar Photovoltaic Project #19 Postponed | Solar | 2.0 mi | 5 |
| Solar Photovoltaic Project #18 Postponed | Solar | 2.1 mi | 0.5 |
| Solar Photovoltaic Project #10 Postponed | Solar | 2.3 mi | 0.5 |
| Solar Photovoltaic Project #04 Postponed | Solar | 2.3 mi | 1.5 |
| Solar Photovoltaic Project #14 Postponed | Solar | 3.1 mi | 1.5 |
| Solar Photovoltaic Project #17 Postponed | Solar | 3.1 mi | 0.5 |
| Solar Photovoltaic Project #12 Postponed | Solar | 3.6 mi | 0.5 |
| Solar Photovoltaic Project #08 Postponed | Solar | 3.7 mi | 0.5 |
| Solar Photovoltaic Project #09 Postponed | Solar | 3.7 mi | 0.5 |
| Roadhouse Energy Center Contracted | Storage | 6.1 mi | 300 |
| Solar Photovoltaic Project #30 Postponed | Solar | 7.4 mi | 1.5 |
| Solar Photovoltaic Project #25 Postponed | Solar | 7.8 mi | 4.5 |
| Solar Photovoltaic Project #27 Postponed | Solar | 7.8 mi | 1 |
| CA Bloomington 2551 S Lilac Avenue Micro Under construction | Solar + storage | 10.3 mi | 3 |
| Solar Photovoltaic Project #24 Postponed | Solar | 10.9 mi | 4 |
| CA Riverside 2356 Fleetwood Dr. Under construction | Solar + storage | 11.2 mi | 4 |
| OES Biogas Power Under construction | Biomass | 12.9 mi | 2.6 |