Starbucks - Evolution Fresh — Power plant · Gas, other · Bloom EnergySolar Photovoltaic Project #31 — Postponed · Solar · CA · 1 MW · 1.0 mi awaySolar Photovoltaic Project #21 — Postponed · Solar · CA · 2.5 MW · 1.3 mi awaySolar Photovoltaic Project #23 — Postponed · Solar · CA · 0.5 MW · 2.0 mi awaySolar Photovoltaic Project #19 — Postponed · Solar · CA · 5 MW · 2.0 mi awaySolar Photovoltaic Project #18 — Postponed · Solar · CA · 0.5 MW · 2.1 mi awaySolar Photovoltaic Project #10 — Postponed · Solar · CA · 0.5 MW · 2.3 mi awaySolar Photovoltaic Project #04 — Postponed · Solar · CA · 1.5 MW · 2.3 mi awaySolar Photovoltaic Project #14 — Postponed · Solar · CA · 1.5 MW · 3.1 mi awaySolar Photovoltaic Project #17 — Postponed · Solar · CA · 0.5 MW · 3.1 mi awaySolar Photovoltaic Project #12 — Postponed · Solar · CA · 0.5 MW · 3.6 mi awaySolar Photovoltaic Project #08 — Postponed · Solar · CA · 0.5 MW · 3.7 mi awaySolar Photovoltaic Project #09 — Postponed · Solar · CA · 0.5 MW · 3.7 mi awayRoadhouse Energy Center — Contracted · Storage · CA · 300 MW · 6.1 mi awaySolar Photovoltaic Project #30 — Postponed · Solar · CA · 1.5 MW · 7.4 mi awaySolar Photovoltaic Project #25 — Postponed · Solar · CA · 4.5 MW · 7.8 mi awaySolar Photovoltaic Project #27 — Postponed · Solar · CA · 1 MW · 7.8 mi awayCA Bloomington 2551 S Lilac Avenue Micro — Under construction · Solar + storage · CA · 3 MW · 10.3 mi awaySolar Photovoltaic Project #24 — Postponed · Solar · CA · 4 MW · 10.9 mi awayCA Riverside 2356 Fleetwood Dr. — Under construction · Solar + storage · CA · 4 MW · 11.2 mi awayOES Biogas Power — Under construction · Biomass · CA · 2.6 MW · 12.9 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Starbucks - Evolution Fresh

Power plant · Gas, other

Key facts

Power plant · Gas, otherran 16% of 2024 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2014
Net generation, 2024
1,509 MWh
Grid
12 kV to Rancho Cucamonga Municipal Utility (CISO)
Location
San Bernardino County, California
Operated by
Bloom Energy

Output

Net generation MWh by year, 2014 to 2024
Fuel burned MMBtu by year, 2014 to 2024
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, other source: “Other Natural Gas”
Age
12 years since 2014
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
June 2024
Capacity retired
1.1 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
SBK00Other Natural Gas1.1 MWRetiredJune 2024

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
Rancho Cucamonga Municipal Utility
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Bloom Energy Operator EIA-860M
Starbucks Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • Stated Unit SBK00 scheduled to retire, 1.1 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Solar Photovoltaic Project #31 Postponed Solar 1.0 mi 1
Solar Photovoltaic Project #21 Postponed Solar 1.3 mi 2.5
Solar Photovoltaic Project #23 Postponed Solar 2.0 mi 0.5
Solar Photovoltaic Project #19 Postponed Solar 2.0 mi 5
Solar Photovoltaic Project #18 Postponed Solar 2.1 mi 0.5
Solar Photovoltaic Project #10 Postponed Solar 2.3 mi 0.5
Solar Photovoltaic Project #04 Postponed Solar 2.3 mi 1.5
Solar Photovoltaic Project #14 Postponed Solar 3.1 mi 1.5
Solar Photovoltaic Project #17 Postponed Solar 3.1 mi 0.5
Solar Photovoltaic Project #12 Postponed Solar 3.6 mi 0.5
Solar Photovoltaic Project #08 Postponed Solar 3.7 mi 0.5
Solar Photovoltaic Project #09 Postponed Solar 3.7 mi 0.5
Roadhouse Energy Center Contracted Storage 6.1 mi 300
Solar Photovoltaic Project #30 Postponed Solar 7.4 mi 1.5
Solar Photovoltaic Project #25 Postponed Solar 7.8 mi 4.5
Solar Photovoltaic Project #27 Postponed Solar 7.8 mi 1
CA Bloomington 2551 S Lilac Avenue Micro Under construction Solar + storage 10.3 mi 3
Solar Photovoltaic Project #24 Postponed Solar 10.9 mi 4
CA Riverside 2356 Fleetwood Dr. Under construction Solar + storage 11.2 mi 4
OES Biogas Power Under construction Biomass 12.9 mi 2.6

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO

Attribution