Show on map
Tehachapi Wind Resource I — Power plant · Wind · CalWind Resources IncTehachapi Wind Resource I unit PLAN — Postponed · Wind · CA · 0.6 MW · 0.0 mi away4001 and 2510 ClearVista Solar and Wind — Withdrawn · Wind · CA · 24.5 MW · 3.2 mi awayWindhub Solar B, LLC — Under construction · Solar · CA · 26.4 MW · 7.5 mi awaySyracuse and Tours Renewable Energy — Permitted · Solar + storage · CA · 80 MW · 8.9 mi awayCamino Solar Hybrid — Postponed · Storage · CA · 11 MW · 9.5 mi awayTehachapi Spindle — Withdrawn · Storage · CA · 20 MW · 11.1 mi awayRosamond South II — Under construction · Storage · CA · 140 MW · 14.6 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Tehachapi Wind Resource I

Power plant · Wind

Key facts

Power plant · Windran 16% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1984
Net generation, 2025
12,303 MWh
Grid
12 kV to Southern California Edison Co (CISO)
Location
Kern County, California
Operated by
CalWind Resources IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
42 years since 1984
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001019645
Location id
L100001017656
Eia plant ids
10191
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 202541,977
Capacity factor, 20250.161
Net generation (MWh), 202512,303
Balancing authority codeCISO

Wind turbines

Turbines
134
Turbine capacity (MW)
8.7
Turbine models
134 Nordtank NTK65/13
Hub height (m)
24
Rotor diameter (m)
16.5
Year online
1984

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Tehachapi Wind Resource I unit PLAN Postponed Wind 0.0 mi 0.6
4001 and 2510 ClearVista Solar and Wind Withdrawn Wind 3.2 mi 24.5
Windhub Solar B, LLC Under construction Solar 7.5 mi 26.4
Syracuse and Tours Renewable Energy Permitted Solar + storage 8.9 mi 80
Camino Solar Hybrid Postponed Storage 9.5 mi 11
Tehachapi Spindle Withdrawn Storage 11.1 mi 20
Rosamond South II Under construction Storage 14.6 mi 140

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 12, 2026Source: California ISO

Attribution