Show on map
UDR Glastonbury Fuel Cell — Power plant · Gas, other · UIL Distributed Resources, LLCNU - WETHERSFIELD DATA CENTER — Built · Large load · CT · 7.2 mi awayHartford Hospital Cogeneration — Postponed · Gas, combustion turbine · CT · 11.5 MW · 7.8 mi awayHomestead Fuel Cell — Postponed · Gas, other · CT · 8.4 MW · 9.8 mi awayElevate Middletown — Announced · Storage · CT · 275 MW · 11.4 mi awayEllington Solar One — Postponed · Solar · CT · 2 MW · 12.0 mi awayMiddletown Solar Two — Postponed · Solar · CT · 1.9 MW · 15.0 mi away
  • Combustion
  • Storage
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

UDR Glastonbury Fuel Cell

Power plant · Gas, other

Key facts

Power plant · Gas, otherran 53% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
15,833 MWh
Grid
23 kV to Eversource (ISNE)
Location
Hartford County, Connecticut
Operated by
UIL Distributed Resources, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025
Fuel burned MMBtu by year, 2016 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, other source: “Other Natural Gas”
Age
10 years since 2016
Heat rate
9,820 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 2025155,477
Capacity factor, 20250.532
Heat rate (Btu/kWh), 20259,819.8
Net generation (MWh), 202515,833
Balancing authority codeISNE

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
February 2036
Capacity scheduled to retire
3.4 MW
Generators scheduled to retire
1
Share of in-service capacity scheduled
100%
Capacity still in service
3.4 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
UDRFCOther Natural Gas3.4 MWScheduled to retireFebruary 2036

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
23 kV
Transmission or distribution system owner
Eversource
Balancing authority
ISO New England Inc.
NERC region
NPCC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit UDRFC scheduled to retire, 3.4 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
NU - WETHERSFIELD DATA CENTER Built Large load 7.2 mi
Hartford Hospital Cogeneration Postponed Gas, combustion turbine 7.8 mi 11.5
Homestead Fuel Cell Postponed Gas, other 9.8 mi 8.4
Elevate Middletown Announced Storage 11.4 mi 275
Ellington Solar One Postponed Solar 12.0 mi 2
Middletown Solar Two Postponed Solar 15.0 mi 1.9

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution