- Combustion
- Storage
- Loads
- In development
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Storage
- Loads
- In development
- Operating
- Size not stated
UDR Glastonbury Fuel Cell: location and 6 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
UDR Glastonbury Fuel Cell
Power plant · Gas, other
Key facts
Power plant · Gas, otherran 53% of 2025 Retiring- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2016
- Net generation, 2025
- 15,833 MWh
- Grid
- 23 kV to Eversource (ISNE)
- Location
- Hartford County, Connecticut
- Operated by
- UIL Distributed Resources, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, other source: “Other Natural Gas”
- Age
- 10 years since 2016
- Heat rate
- 9,820 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 155,477 |
| Capacity factor, 2025 | 0.532 |
| Heat rate (Btu/kWh), 2025 | 9,819.8 |
| Net generation (MWh), 2025 | 15,833 |
| Balancing authority code | ISNE |
Retirement
EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.- Next scheduled retirement
- February 2036
- Capacity scheduled to retire
- 3.4 MW
- Generators scheduled to retire
- 1
- Share of in-service capacity scheduled
- 100%
- Capacity still in service
- 3.4 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| UDRFC | Other Natural Gas | 3.4 MW | Scheduled to retire | February 2036 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 23 kV
- Transmission or distribution system owner
- Eversource
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit UDRFC scheduled to retire, 3.4 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| NU - WETHERSFIELD DATA CENTER Built | Large load | 7.2 mi | |
| Hartford Hospital Cogeneration Postponed | Gas, combustion turbine | 7.8 mi | 11.5 |
| Homestead Fuel Cell Postponed | Gas, other | 9.8 mi | 8.4 |
| Elevate Middletown Announced | Storage | 11.4 mi | 275 |
| Ellington Solar One Postponed | Solar | 12.0 mi | 2 |
| Middletown Solar Two Postponed | Solar | 15.0 mi | 1.9 |
Sources EPA ICIS-Air · EIA-860M