United Health Care — Power plant · Oil · Northern States Power Co - MinnesotaSUPERCOMPUTER LLC — Built · Large load · MN · 3.9 mi awayFIS GLOBAL — Built · Large load · MN · 5.2 mi awayOPTUM TECHNOLOGY — Built · Large load · MN · 6.0 mi awayFAIRVIEW DATA CENTER — Built · Large load · MN · 6.6 mi awayDATA RECOGNITION CORP — Built · Large load · MN · 7.3 mi awayTC Solar RCE — Postponed · Solar · MN · 1 MW · 9.7 mi awayDATABANK MSP3 — Built · Large load · MN · 11.1 mi awayHB FULLER CO - DATA CENTER - ARDEN HILLS — Built · Large load · MN · 11.2 mi awayBlack Dog — Postponed · Gas, combined cycle · MN · 760 MW · 13.2 mi awayIRON GATE DATA CENTERS - EAGAN — Built · Large load · MN · 13.6 mi awayBlue Lake BESS — Under construction · Storage · MN · 135.5 MW · 14.0 mi awayDATABANK - EAGAN - MSP2 — Built · Large load · MN · 14.6 mi away
  • Combustion
  • Storage
  • Loads
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

United Health Care

Power plant · Oil

Key facts

Power plant · Oil Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1993
Net generation, 2008
-5 MWh
Grid
MISO
Location
Hennepin County, Minnesota

Output

Net generation MWh by year, 2003 to 2008
Fuel burned MMBtu by year, 2003 to 2008
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Oil source: “Petroleum Liquids”
Age
33 years since 1993
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
February 2008
Capacity retired
3.6 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Petroleum Liquids1.8 MWRetiredFebruary 2008
2Petroleum Liquids1.8 MWRetiredFebruary 2008

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
United Health Care Owner 100.0% Dec 31, 2025 EIA-860
Northern States Power Co - Minnesota Operator EIA-860M

Timeline

  • Stated Units 1, 2 scheduled to retire, 3.6 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SUPERCOMPUTER LLC Built Large load 3.9 mi
FIS GLOBAL Built Large load 5.2 mi
OPTUM TECHNOLOGY Built Large load 6.0 mi
FAIRVIEW DATA CENTER Built Large load 6.6 mi
DATA RECOGNITION CORP Built Large load 7.3 mi
TC Solar RCE Postponed Solar 9.7 mi 1
DATABANK MSP3 Built Large load 11.1 mi
HB FULLER CO - DATA CENTER - ARDEN HILLS Built Large load 11.2 mi
Black Dog Postponed Gas, combined cycle 13.2 mi 760
IRON GATE DATA CENTERS - EAGAN Built Large load 13.6 mi
Blue Lake BESS Under construction Storage 14.0 mi 135.5
DATABANK - EAGAN - MSP2 Built Large load 14.6 mi