Show on map
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
Westwing: location and 11 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Westwing
Power plant · Storage
Key facts
Power plant · Storage Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2024
- Net generation, 2025
- -21,745 MWh
- Grid
- 230 kV to Arizona Public Service Co (AZPS)
- Location
- Maricopa County, Arizona
- Operated by
- AES Clean EnergySourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Batteries”
- Age
- 2 years since 2024
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | -21,745 |
| Balancing authority code | AZPS |
Data notes (1)
- Capacity factor, 2025 not shown: net generation -21745.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Desert Bloom Under construction | Storage | 1.1 km | 150 |
| Compass Datacenter Under construction | Large load | 15.2 km | |
| MICROSOFT CORP - OLIVE AVE Built | Large load | 16.4 km | |
| Microsoft Phx 83 (El Mirage data centre) Filed | Large load | 17.1 km | |
| Aligned Phx 7 Filed | Large load | 17.5 km | |
| MERIT 2 Built | Large load | 17.8 km | |
| APS - ALIGNED ENERGY DATA CENTER Built | Large load | 20.6 km | |
| PHX01 / PHX02 / PHX03 / PHX05 Built | Large load | 20.8 km | |
| QTS DC13 - Temp Crane - NE Filed | Large load | 23.4 km | |
| White Tank Energy Storage Under construction | Storage | 23.9 km | 100 |
| QTS PHX3 Data Center Built | Large load | 24.4 km |
Sources EIA-860M · EPA ICIS-NPDES · EPA ICIS-Air · FAA OE/AAA
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)