Show on map
Wolfcastle — Power plant · Solar · Beartooth Energy Storage, LLCMMH 4 SW corner Mobile crane for picking (Dekalb data centre) — Large load · IL · 10.7 km awayRed Maple LRE — Solar · IL · 95 MW · 11.2 km awayMMH2 NE corner Mobile crane for picking (Dekalb data centre) — Large load · IL · 11.3 km awayOwens Creek Solar — Solar · IL · 500 MW · 12.3 km awayALLSTATE DATA CENTER — Large load · IL · 16.3 km awayTHE NORTHERN TRUST CO — Large load · IL · 16.7 km awaySV CSG Kingston Solar 1 — Solar · IL · 5 MW · 18.2 km awaySteward Creek Solar Phase 1 — Solar · IL · 1,200 MW · 20.1 km away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 20% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
3,526 MWh
Grid
12 kV to Commonwealth Edison Co (PJM)
Location
DeKalb County, Illinois
Operated by
Beartooth Energy Storage, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000818689
Location id
L100000815801
Eia plant ids
64736
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Commonwealth Edison Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 202512,030
Capacity factor, 20250.201
Net generation (MWh), 20253,526
Balancing authority codePJM

Solar arrays

Array area (acres)
9.2
AC capacity (MW)
2
DC capacity (MW)
3
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2021

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
MMH 4 SW corner Mobile crane for picking (Dekalb data centre) Filed Large load 10.7 km
Red Maple LRE Filed Solar 11.2 km 95
MMH2 NE corner Mobile crane for picking (Dekalb data centre) Filed Large load 11.3 km
Owens Creek Solar Postponed Solar 12.3 km 500
ALLSTATE DATA CENTER Built Large load 16.3 km
THE NORTHERN TRUST CO Built Large load 16.7 km
SV CSG Kingston Solar 1 Under construction Solar 18.2 km 5
Steward Creek Solar Phase 1 Announced Solar 20.1 km 1,200