Wolfcastle — Power plant · Solar · Beartooth Energy Storage, LLCBeartooth Energy Storage LLC — Filed · Filed · Storage · MT · 50 MWMMH 4 SW corner Mobile crane for picking (Dekalb data centre) — Filed · Large load · IL · 6.6 mi awayRed Maple LRE — Filed · Solar · IL · 95 MW · 6.9 mi awayMMH2 NE corner Mobile crane for picking (Dekalb data centre) — Filed · Large load · IL · 7.0 mi awayOwens Creek Solar — Postponed · Solar · IL · 500 MW · 7.6 mi awayALLSTATE DATA CENTER — Built · Large load · IL · 10.1 mi awayTHE NORTHERN TRUST CO — Built · Large load · IL · 10.4 mi awaySV CSG Kingston Solar 1 — Under construction · Solar · IL · 5 MW · 11.3 mi awaySteward Creek Solar Phase 1 — Announced · Solar · IL · 1,200 MW · 12.5 mi away
  • Wind & solar
  • Storage
  • In development
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Beartooth Energy Storage, LLC

Follow this company

Independent power producer

Key facts

Independent power producer · 2 MW
Assets
1
Projects
1
States
IL
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,120 of 50,273 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2021 to 2025
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
20253,5263,526
20244,0174,017
20234,1574,157
20224,0444,044
2021 (part year)148148

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 9, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 1

Assets

1

Capacity

2.0 MW

MW by fuel
  1. Solar: 2.0 MW, 1 asset

Operates 1 power plant

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 8

within 15 mi

Projects

8

within 15 mi

Nearest

6.6 mi

MMH 4 SW corner Mobile crane for picking (Dekalb data centre)

All 8NearbyShowing all 8 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Filed MMH 4 SW corner Mobile crane for picking (Dekalb data centre) Large load — 6.6 mi away nearest: Wolfcastle
Filed Red Maple LRE Solar 95 MW 6.9 mi away nearest: Wolfcastle
Filed MMH2 NE corner Mobile crane for picking (Dekalb data centre) Large load — 7.0 mi away nearest: Wolfcastle
Postponed Owens Creek Solar Solar 500 MW 7.6 mi away nearest: Wolfcastle
Built ALLSTATE DATA CENTER Large load — 10.1 mi away nearest: Wolfcastle
Built THE NORTHERN TRUST CO Large load — 10.4 mi away nearest: Wolfcastle
Under construction SV CSG Kingston Solar 1 Solar 5 MW 11.3 mi away nearest: Wolfcastle
Announced Steward Creek Solar Phase 1 Solar 1,200 MW 12.5 mi away nearest: Wolfcastle

Sources FAA OE/AAA · EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES

Sources

Every source and license · Attribution