345 kV Corn Trail Switch Substation (#11441)

Open in Projects

Substation

Key facts

Substation
Voltage
345 kV
Capacity queued
412.2 MW, 1 active project
Queue
ERCOT
Kind
Substation
Voltage
345 kV
Bus number
11441
Jurisdiction
US-TX
Substation
—
Active queued (MW)
412.2 across 1 project
Withdrawn or canceled (MW)
0 across 0
Built (MW)
0 across 0
About this point

A grid connection point as ERCOT GIS Report (Generator Interconnection Status) names it. Projects connect here; they are not necessarily built here. Totals count only the projects listed under Projects.

By technology

Projects at this point by technology, largest active capacity first.
Technology Active MW Active projects All projects
Storage 412.2 1 1

Projects connecting here

All 1 in Projects

Sources

1 source

Sources ERCOT

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026

Every source and license · Attribution