345 kV Corn Trail Switch Substation (#11441)

Open in Projects

Substation

Key facts

Substation
Voltage
345 kV
Capacity queued
412.2 MW, 1 active project

Projects connecting here

Projects that connect at this point: active first, then built, other and withdrawn, each by capacity.
Status Name Company Technology Capacity (MW) Jurisdiction Proposed online
Studied Merope BESS BRP Merope BESS LLC Storage 412.2 US-TX Aug 1, 2028

Sources

1 source

Sources ERCOT