Chenango Solar — Power plant · Solar · Citizens Enterprises CorporationOak Street Solar — Power plant · Solar · Citizens Enterprises CorporationPalmer Renewable Energy — Postponed · Biomass · MA · 42 MW · 2.5 mi awayStony Brook — Postponed · Gas, combined cycle · MA · 422 MW · 3.5 mi awayWatson 2 — Under construction · Solar · NY · 4.9 MW · 6.0 mi awayWatson 1 — Under construction · Solar · NY · 4.8 MW · 6.0 mi awayChicopee BESS — Under construction · Storage · MA · 5 MW · 6.1 mi awayRiverside Holyoke — Postponed · Hydro · MA · 1.1 MW · 6.1 mi awayHadley Falls — Postponed · Hydro · MA · 3.5 MW · 7.0 mi awayHolyoke MA BESS 1 — Under construction · Storage · MA · 5 MW · 7.9 mi awayEndicott — Announced · Solar · NY · 5 MW · 9.6 mi awayBelchertown Solar PV + Battery Project — Under construction · Solar + storage · MA · 5.6 MW · 12.3 mi away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Citizens Solar Holdings IX, LLC

Follow this company

Power plant owner

Key facts

Power plant owner · 8.4 MW
Assets
2
States
MA, NY
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

2 of 2 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 2 of 2 plants with a stake: US plants with an EIA monthly series.100% of the output is from 2 plants recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2019 to 2025
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
202512,10112,101
202412,09612,096
202311,94711,947
202212,08912,089
202112,07212,072
20205,7715,771
2019 (part year)00

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 2

Assets

2

Capacity

8.4 MW

MW by fuel
  1. Solar: 8.4 MW, 2 assets

Owns 2 power plants

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 10

within 15 mi

Projects

10

within 15 mi

Nearest

2.5 mi

Palmer Renewable Energy

All 10NearbyShowing all 10 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Palmer Renewable Energy Biomass 42 MW 2.5 mi away nearest: Oak Street Solar
Postponed Stony Brook Gas, combined cycle 422 MW 3.5 mi away nearest: Oak Street Solar
Under construction Watson 2 Solar 4.9 MW 6.0 mi away nearest: Chenango Solar
Under construction Watson 1 Solar 4.8 MW 6.0 mi away nearest: Chenango Solar
Under construction Chicopee BESS Storage 5 MW 6.1 mi away nearest: Oak Street Solar
Postponed Riverside Holyoke Hydro 1.1 MW 6.1 mi away nearest: Oak Street Solar
Postponed Hadley Falls Hydro 3.5 MW 7.0 mi away nearest: Oak Street Solar
Under construction Holyoke MA BESS 1 Storage 5 MW 7.9 mi away nearest: Oak Street Solar
Announced Endicott Solar 5 MW 9.6 mi away nearest: Chenango Solar
Under construction Belchertown Solar PV + Battery Project Solar + storage 5.6 MW 12.3 mi away nearest: Oak Street Solar

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution