Ratkovich Alhambra — Power plant · Gas, other · Bloom EnergyCBS Studio Center — Power plant · Gas, other · Crestmark BankGlenarm BESS Plant — Filed · Storage · CA · 25 MW · 5.1 km awayCalifornia Institute of Technology — Postponed · Gas, combined cycle · CA · 16.5 MW · 6.8 km awayScholl Canyon — Under construction · Biomass · CA · 12 MW · 9.1 km awayBandini - SLLAX710 — Under construction · Solar · CA · 1.3 MW · 11.0 km awayPRIME DATA CENTER VERNON — Built · Large load · CA · 11.5 km awayAB Van Nuys — Announced · Solar · CA · 1.6 MW · 11.6 km awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 12.1 km awayCPA 3777 Workman — Postponed · Solar · CA · 1.9 MW · 12.3 km awayFoothill Solar Project — Postponed · Solar · CA · 1.1 MW · 14.9 km awayGabriel — Under construction · Storage · CA · 400 MW · 17.0 km awayVan Norman Bypass Solar Project — Postponed · Solar · CA · 2 MW · 18.2 km away20525 Nordhoff PV (North) — Under construction · Solar · CA · 1.9 MW · 20.2 km awayMarici — Under construction · Storage · CA · 400 MW · 20.6 km away
  • Combustion
  • Operating
  • Retired
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Crestmark Bank

Follow this company

Power plant owner

Key facts

Power plant owner · 3.4 MW
Assets
2
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why

Gross output of plants with a stake

2 of 2 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 2 of 2 plants with a stake: US plants with an EIA monthly series.100% of the output is from 2 plants recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2013 to 2025
  • Gas
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearGasTotal (MWh)
20257,3997,399
20248,0118,011
202312,33512,335
202210,38210,382
202112,96312,963
202015,90115,901
201917,26817,268
20188,8448,844
20179,2429,242
20169,4969,496
20159,3549,354
201410,29710,297
2013 (part year)4,3664,366

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 9, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 2

Assets

2

Capacity

3.4 MW

MW by fuel
  1. Gas, other: 3.4 MW, 2 assets

Operates 1 power plant · Owns 1 power plant

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Share Held by
CBS Studio Center Gas, other Operates 2.4 MW US-CA — Crestmark Bank
Ratkovich Alhambra Gas, other Owns 1 MW US-CA 100.0% Crestmark Bank

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

Around this company

Nearby 13

within 25 km

Projects

13

within 25 km

Nearest

5.1 km

Glenarm BESS Plant

All 13NearbyShowing all 13 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Filed Glenarm BESS Plant Storage 25 MW 5.1 km away nearest: Ratkovich Alhambra
Postponed California Institute of Technology Gas, combined cycle 16.5 MW 6.8 km away nearest: Ratkovich Alhambra
Under construction Scholl Canyon Biomass 12 MW 9.1 km away nearest: Ratkovich Alhambra
Under construction Bandini - SLLAX710 Solar 1.3 MW 11.0 km away nearest: Ratkovich Alhambra
Built PRIME DATA CENTER VERNON Large load — 11.5 km away nearest: Ratkovich Alhambra
Announced AB Van Nuys Solar 1.6 MW 11.6 km away nearest: CBS Studio Center
Postponed LATTC South Campus Solar Solar 1.1 MW 12.1 km away nearest: Ratkovich Alhambra
Postponed CPA 3777 Workman Solar 1.9 MW 12.3 km away nearest: Ratkovich Alhambra
Postponed Foothill Solar Project Solar 1.1 MW 14.9 km away nearest: CBS Studio Center
Under construction Gabriel Storage 400 MW 17.0 km away nearest: Ratkovich Alhambra
Postponed Van Norman Bypass Solar Project Solar 2 MW 18.2 km away nearest: CBS Studio Center
Under construction 20525 Nordhoff PV (North) Solar 1.9 MW 20.2 km away nearest: CBS Studio Center
Under construction Marici Storage 400 MW 20.6 km away nearest: Ratkovich Alhambra

Sources EIA-860M · EPA ICIS-NPDES · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • CAISOOpen license, with credit · retrieved Nov 11, 2026Source: California ISO

Every source and license · Attribution