CBS Studio Center
Power plant · Gas, other
Key facts
Power plant · Gas, otherran 22% of 2023 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2013
- Net generation, 2023
- 4,522 MWh
- Location
- Los Angeles County, California
- Operated by
- Crestmark BankSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, other source: “Other Natural Gas”
- Age
- 13 years since 2013
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | LDWP |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- September 2023
- Capacity retired
- 2.4 MW
- Generators retired
- 6
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 9560 | Other Natural Gas | 0.4 MW | Retired | September 2023 |
| 9580 | Other Natural Gas | 0.4 MW | Retired | September 2023 |
| 9581 | Other Natural Gas | 0.4 MW | Retired | September 2023 |
| 9583 | Other Natural Gas | 0.4 MW | Retired | September 2023 |
| 9585 | Other Natural Gas | 0.4 MW | Retired | September 2023 |
| 9587 | Other Natural Gas | 0.4 MW | Retired | September 2023 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- LDWP
Transmission lines within 15 mi (10)
- Nichols Canyon 138 kV line
- Nichols Canyon 230 kV line
- Station G Atwater 230 kV line
- Rinaldi 230 kV line
- Station H Hollywood - Nichols Canyon 230 kV
- Station G Atwater 230 kV line
- Tarzanastation U - Kenter Canyon 230 kV
- Eagle Rock - Sylmar West 230 kV
- Gould - Sylmar West 230 kV
- Tarzanastation U - Rinaldi 230 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 9560, 9580, 9581, 9583, 9585, 9587 scheduled to retire, 2.4 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| AB Van Nuys Announced | Solar | 7.2 mi | 1.6 |
| Foothill Solar Project Postponed | Solar | 9.3 mi | 1.1 |
| LATTC South Campus Solar Postponed | Solar | 10.4 mi | 1.1 |
| Van Norman Bypass Solar Project Postponed | Solar | 11.3 mi | 2 |
| Scholl Canyon Under construction | Biomass | 11.4 mi | 12 |
| 20525 Nordhoff PV (North) Under construction | Solar | 12.5 mi | 1.9 |
| PRIME DATA CENTER VERNON Built | Large load | 13.5 mi | |
| Glenarm BESS Plant Filed | Storage | 14.0 mi | 25 |
Sources EIA-860M · EPA ICIS-NPDES