CBS Studio Center — Power plant · Gas, other · Crestmark BankAB Van Nuys — Announced · Solar · CA · 1.6 MW · 7.2 mi awayFoothill Solar Project — Postponed · Solar · CA · 1.1 MW · 9.3 mi awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 10.4 mi awayVan Norman Bypass Solar Project — Postponed · Solar · CA · 2 MW · 11.3 mi awayScholl Canyon — Under construction · Biomass · CA · 12 MW · 11.4 mi away20525 Nordhoff PV (North) — Under construction · Solar · CA · 1.9 MW · 12.5 mi awayPRIME DATA CENTER VERNON — Built · Large load · CA · 13.5 mi awayGlenarm BESS Plant — Filed · Storage · CA · 25 MW · 14.0 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

CBS Studio Center

Power plant · Gas, other

Key facts

Power plant · Gas, otherran 22% of 2023 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2013
Net generation, 2023
4,522 MWh
Location
Los Angeles County, California
Operated by
Crestmark BankSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2013 to 2024
Fuel burned MMBtu by year, 2013 to 2024
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, other source: “Other Natural Gas”
Age
13 years since 2013
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeLDWP

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
September 2023
Capacity retired
2.4 MW
Generators retired
6
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
9560Other Natural Gas0.4 MWRetiredSeptember 2023
9580Other Natural Gas0.4 MWRetiredSeptember 2023
9581Other Natural Gas0.4 MWRetiredSeptember 2023
9583Other Natural Gas0.4 MWRetiredSeptember 2023
9585Other Natural Gas0.4 MWRetiredSeptember 2023
9587Other Natural Gas0.4 MWRetiredSeptember 2023

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
LDWP
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 9560, 9580, 9581, 9583, 9585, 9587 scheduled to retire, 2.4 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AB Van Nuys Announced Solar 7.2 mi 1.6
Foothill Solar Project Postponed Solar 9.3 mi 1.1
LATTC South Campus Solar Postponed Solar 10.4 mi 1.1
Van Norman Bypass Solar Project Postponed Solar 11.3 mi 2
Scholl Canyon Under construction Biomass 11.4 mi 12
20525 Nordhoff PV (North) Under construction Solar 12.5 mi 1.9
PRIME DATA CENTER VERNON Built Large load 13.5 mi
Glenarm BESS Plant Filed Storage 14.0 mi 25