Commerce Refuse To Energy — Power plant · Waste to energy · Los Angeles County SanitationBandini - SLLAX710 — Under construction · Solar · CA · 1.3 MW · 1.3 mi awayPRIME DATA CENTER VERNON — Built · Large load · CA · 4.4 mi awayCPA 3777 Workman — Postponed · Solar · CA · 1.9 MW · 6.7 mi awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 7.1 mi awayGlenarm BESS Plant — Filed · Storage · CA · 25 MW · 9.2 mi awayCalifornia Institute of Technology — Postponed · Gas, combined cycle · CA · 16.5 MW · 10.1 mi awaySouth Bay Dis Ctr 6-SLLAX680 — Under construction · Solar · CA · 1.3 MW · 11.2 mi awayFordyce - SLLAX680 — Under construction · Solar · CA · 1.3 MW · 11.2 mi awaySouth Bay Dis Ctr 12 - SLLAX104 — Under construction · Solar · CA · 1.2 MW · 11.3 mi awayScholl Canyon — Under construction · Biomass · CA · 12 MW · 11.4 mi awayDominguez - SLLAX512 — Under construction · Solar · CA · 1.3 MW · 11.5 mi awayMarici — Under construction · Storage · CA · 400 MW · 11.9 mi awayGabriel — Under construction · Storage · CA · 400 MW · 13.2 mi awayWatson Cogeneration — Withdrawn · Gas, combined cycle · CA · 94.2 MW · 13.4 mi awayTorrance Dis Ctr 2 - SLLAX100 — Under construction · Solar · CA · 1.4 MW · 13.9 mi away
  • Bioenergy
  • Retired
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Los Angeles County Sanitation Districts

Follow this company

Power plant owner

As filed: LOS ANGELES COUNTY SANITATION DISTRICTS

Key facts

Power plant owner · 12 MW
Assets
1
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2018
  • Bioenergy
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearBioenergyTotal (MWh)
2018 (part year)35,99235,992
201771,58371,583
201679,50879,508
201580,95780,957
201472,85472,854
201375,95175,951
201274,88074,880
201175,56275,562
201073,87173,871
200972,73172,731
200871,34671,346
200766,22266,222
200669,83369,833
200568,07268,072
200471,92271,922
200368,42968,429
200269,98469,984
200174,99574,995

Sources EIA-860M · EIA · EPA GHGRP

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EPA GHGRPOpen license · retrieved Nov 2, 2026

Attribution

Assets 1

Assets

1

Capacity

12.0 MW

MW by fuel
  1. Waste to energy: 12.0 MW, 1 asset

Owns 1 power plant

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

Around this company

Nearby 15

within 15 mi

Projects

15

within 15 mi

Nearest

1.3 mi

Bandini - SLLAX710

All 15NearbyShowing all 15 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Under construction Bandini - SLLAX710 Solar 1.3 MW 1.3 mi away nearest: Commerce Refuse To Energy
Built PRIME DATA CENTER VERNON Large load — 4.4 mi away nearest: Commerce Refuse To Energy
Postponed CPA 3777 Workman Solar 1.9 MW 6.7 mi away nearest: Commerce Refuse To Energy
Postponed LATTC South Campus Solar Solar 1.1 MW 7.1 mi away nearest: Commerce Refuse To Energy
Filed Glenarm BESS Plant Storage 25 MW 9.2 mi away nearest: Commerce Refuse To Energy
Postponed California Institute of Technology Gas, combined cycle 16.5 MW 10.1 mi away nearest: Commerce Refuse To Energy
Under construction South Bay Dis Ctr 6-SLLAX680 Solar 1.3 MW 11.2 mi away nearest: Commerce Refuse To Energy
Under construction Fordyce - SLLAX680 Solar 1.3 MW 11.2 mi away nearest: Commerce Refuse To Energy
Under construction South Bay Dis Ctr 12 - SLLAX104 Solar 1.2 MW 11.3 mi away nearest: Commerce Refuse To Energy
Under construction Scholl Canyon Biomass 12 MW 11.4 mi away nearest: Commerce Refuse To Energy
Under construction Dominguez - SLLAX512 Solar 1.3 MW 11.5 mi away nearest: Commerce Refuse To Energy
Under construction Marici Storage 400 MW 11.9 mi away nearest: Commerce Refuse To Energy
Under construction Gabriel Storage 400 MW 13.2 mi away nearest: Commerce Refuse To Energy
Withdrawn Watson Cogeneration Gas, combined cycle 94.2 MW 13.4 mi away nearest: Commerce Refuse To Energy
Under construction Torrance Dis Ctr 2 - SLLAX100 Solar 1.4 MW 13.9 mi away nearest: Commerce Refuse To Energy

Sources EIA-860M · EPA ICIS-NPDES · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • CAISOOpen license, with credit · retrieved Nov 18, 2026Source: California ISO

Every source and license · Attribution