Maxim — Power plant · Gas, other · Bloom EnergyEDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT — Large load · CA · 2.8 km awayEdgecore -3580 — Large load · CA · 2.8 km awaySJC02 & SJC03 DATA CENTER — Large load · CA · 2.9 km awayLBA Data Center West — Large load · CA · 3.0 km awayKifer BESS 1 — Storage · CA · 50 MW · 3.3 km away4054 Digital Realty — Large load · CA · 3.7 km awaySV8 DATA CENTER — Large load · CA · 3.7 km awayVANTAGE DATA CENTERS MANAGEMENT CO , LLC — Large load · CA · 4.1 km awayPRIME DATA CENTERS — Large load · CA · 4.5 km away1200 Memorex Skybox Data Center — Large load · CA · 4.6 km awaySKYBOX DATA CENTER — Large load · CA · 4.8 km away888 Ross Data Center — Large load · CA · 7.4 km awayDC-N (San Jose data centre) — Large load · CA · 8.7 km awayFremont CA AutoFactory — Solar · CA · 3.8 MW · 9.7 km awayData Center — Large load · CA · 10.0 km awayWaste Management Tri-Cities LFGTE — Biomass · CA · 4.8 MW · 10.7 km away7999 Gateway Solar — Solar · CA · 4.6 MW · 15.1 km awayGateway#1&2 (Newark CA) — Solar · CA · 1.1 MW · 18.0 km awayCHINA MOBILE INTERNATIONAL SAN JOSE DATA CENTER — Large load · CA · 24.0 km awayEquinix SV-19 - 131 Great Oaks Blvd SJ — Large load · CA · 24.2 km away
  • Combustion
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Power plant owner

Key facts

Power plant owner · 1.1 MW
Assets
1
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,118 of 50,271 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2014 to 2025
  • Gas
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearGasTotal (MWh)
20256,9486,948
20245,9575,957
20236,5576,557
20227,3557,355
20217,3367,336
20207,1177,117
20197,1727,172
20187,2157,215
20177,9487,948
20168,1288,128
20159,3689,368
2014 (part year)3,8543,854

Sources EIA-860 · EIA-860M · EIA

Sources

Attribution

Assets 1

Assets

1

Capacity

1.1 MW

MW by fuel
  1. Gas, other: 1.1 MW, 1 asset

Owns 1 power plant

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Share Held by
Maxim Gas, other Owns 1.1 MW US-CA 100.0% Maxim

Around this company

Nearby 20

within 25 km

Projects

20

within 25 km

Nearest

2.8 km

EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT

All 20NearbyShowing all 20 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Unknown EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT Large load — 2.8 km away nearest: Maxim
Filed Edgecore -3580 Large load — 2.8 km away nearest: Maxim
Unknown SJC02 & SJC03 DATA CENTER Large load — 2.9 km away nearest: Maxim
Filed LBA Data Center West Large load — 3.0 km away nearest: Maxim
Under construction Kifer BESS 1 Storage 50 MW 3.3 km away nearest: Maxim
Built 4054 Digital Realty Large load — 3.7 km away nearest: Maxim
Unknown SV8 DATA CENTER Large load — 3.7 km away nearest: Maxim
Unknown VANTAGE DATA CENTERS MANAGEMENT CO , LLC Large load — 4.1 km away nearest: Maxim
Built PRIME DATA CENTERS Large load — 4.5 km away nearest: Maxim
Filed 1200 Memorex Skybox Data Center Large load — 4.6 km away nearest: Maxim
Built SKYBOX DATA CENTER Large load — 4.8 km away nearest: Maxim
Filed 888 Ross Data Center Large load — 7.4 km away nearest: Maxim
Filed DC-N (San Jose data centre) Large load — 8.7 km away nearest: Maxim
Under construction Fremont CA AutoFactory Solar 3.8 MW 9.7 km away nearest: Maxim
Filed Data Center Large load — 10.0 km away nearest: Maxim
Postponed Waste Management Tri-Cities LFGTE Biomass 4.8 MW 10.7 km away nearest: Maxim
Under construction 7999 Gateway Solar Solar 4.6 MW 15.1 km away nearest: Maxim
Announced Gateway#1&2 (Newark CA) Solar 1.1 MW 18.0 km away nearest: Maxim
Unknown CHINA MOBILE INTERNATIONAL SAN JOSE DATA CENTER Large load — 24.0 km away nearest: Maxim
Filed Equinix SV-19 - 131 Great Oaks Blvd SJ Large load — 24.2 km away nearest: Maxim