Crafton Hills College Solar Farm — Power plant · Solar · San Bernardino Comm College DistEnergy Center — Announced · Gas, combustion turbine · CA · 0.9 MW · 4.0 mi awayRCWMD Badlands Landfill Gas Project — Postponed · Biomass · CA · 1.2 MW · 6.0 mi awayRedlands DC 9 - sline609 — Under construction · Solar + storage · CA · 5 MW · 6.6 mi awaySolar Photovoltaic Project #20 — Postponed · Solar · CA · 3.5 MW · 6.8 mi awaySunE Redlands — Postponed · Solar · CA · 1.5 MW · 8.6 mi awaySolar Photovoltaic Project #28 — Postponed · Solar · CA · 0.5 MW · 10.6 mi awayAmazon - Moreno Valley — Postponed · Solar · CA · 2.2 MW · 14.2 mi awayLake Perris Solar — Postponed · Solar · CA · 1.5 MW · 14.4 mi awaySan Jacinto Solar — Postponed · Solar · CA · 1.5 MW · 14.5 mi away
  • Wind & solar
  • Retired
  • Other companies nearby
  • 10 · 100 · 1,000 MW

San Bernardino Comm College Dist

Follow this company

Power plant owner

Key facts

Power plant owner · 1.3 MW
Assets
1
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2012 to 2023
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
202300
20225555
20211,0531,053
20201,3681,368
20191,5141,514
2018803803
2017-394-394
20161,8061,806
20152,0902,090
20141,2551,255
20131,4601,460
2012 (part year)866866

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 1

Assets

1

Capacity

1.3 MW

MW by fuel
  1. Solar: 1.3 MW, 1 asset

Operates 1 power plant

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 9

within 15 mi

Projects

9

within 15 mi

Nearest

4.0 mi

Energy Center

All 9NearbyShowing all 9 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Announced Energy Center Gas, combustion turbine 0.9 MW 4.0 mi away nearest: Crafton Hills College Solar Farm
Postponed RCWMD Badlands Landfill Gas Project Biomass 1.2 MW 6.0 mi away nearest: Crafton Hills College Solar Farm
Under construction Redlands DC 9 - sline609 Solar + storage 5 MW 6.6 mi away nearest: Crafton Hills College Solar Farm
Postponed Solar Photovoltaic Project #20 Solar 3.5 MW 6.8 mi away nearest: Crafton Hills College Solar Farm
Postponed SunE Redlands Solar 1.5 MW 8.6 mi away nearest: Crafton Hills College Solar Farm
Postponed Solar Photovoltaic Project #28 Solar 0.5 MW 10.6 mi away nearest: Crafton Hills College Solar Farm
Postponed Amazon - Moreno Valley Solar 2.2 MW 14.2 mi away nearest: Crafton Hills College Solar Farm
Postponed Lake Perris Solar Solar 1.5 MW 14.4 mi away nearest: Crafton Hills College Solar Farm
Postponed San Jacinto Solar Solar 1.5 MW 14.5 mi away nearest: Crafton Hills College Solar Farm

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution