Suncaster, LLC — Power plant · Solar · Suncaster, LLCWilfork Solar — Solar · NC · 5 MW · 8.6 km awayIcarus Solar — Solar · NC · 3 MW · 18.3 km awayStevens Mill Solar — Solar · NC · 80 MW · 21.4 km awaySignature Solar — Solar · NC · 5 MW · 21.9 km awaySadie Solar — Solar · NC · 5 MW · 22.7 km awayBradley Farm (Dudley) — Solar · NC · 5 MW · 23.4 km awayMP Wilson LLC — Biomass · NC · 2.2 MW · 23.5 km awayRoady Lane Farm LLC — Solar · NC · 74.8 MW · 23.6 km away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Suncaster, LLC

Follow this company

Independent power producer

Key facts

Independent power producer · 2.4 MW
Assets
1
States
NC
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,118 of 50,271 companies here. Why

Assets 1

Assets

1

Capacity

2.4 MW

MW by fuel
  1. Solar: 2.4 MW, 1 asset

Operates 1 power plant

Sources EIA-860M · GEM

Sources

Every source and license · Attribution

Around this company

Nearby 8

within 25 km

Projects

8

within 25 km

Nearest

8.6 km

Wilfork Solar

All 8NearbyShowing all 8 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Wilfork Solar Solar 5 MW 8.6 km away nearest: Suncaster, LLC
Postponed Icarus Solar Solar 3 MW 18.3 km away nearest: Suncaster, LLC
Filed Stevens Mill Solar Solar 80 MW 21.4 km away nearest: Suncaster, LLC
Postponed Signature Solar Solar 5 MW 21.9 km away nearest: Suncaster, LLC
Postponed Sadie Solar Solar 5 MW 22.7 km away nearest: Suncaster, LLC
Postponed Bradley Farm (Dudley) Solar 5 MW 23.4 km away nearest: Suncaster, LLC
Postponed MP Wilson LLC Biomass 2.2 MW 23.5 km away nearest: Suncaster, LLC
Postponed Roady Lane Farm LLC Solar 74.8 MW 23.6 km away nearest: Suncaster, LLC