Projects in development
Supply side: grid queues, permits and planned plants · Suggest a missing project
Status not current MISO queue as of 31 December 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0)
Status not current
The status is the one the file states on that date, not the register’s current one.
What this view shows
4 projects no register lists any more are hidden. Show them
Save this search as an alert Free, daily or weekly.
| Status | Name. Sort by name, A to Z | Technology | Capacity (MW), sorted descending. Sort by capacity, smallest first | Location | Company | Proposed online. Sort by proposed online date, latest first | Source |
|---|---|---|---|---|---|---|---|
| Filed (source status: Scoping) | Bute Hydrogen Project 1 | Gas, combined cycle | 4,800 MW | Trent Valley South Connection Node D 400kV Substation, United Kingdom | Haldane Energy Project 1 Limited | Online 30 Oct 2035 | NESO |
| Filed (source status: Scoping) | Drax BECCS | Biomass | 3,906 MW | Drax 400kV Substation, United Kingdom | Drax Power Limited | Online 30 Oct 2035 | NESO |
| Filed (source status: Scoping) | Bute Hydrogen Project 6 | Gas, combined cycle | 3,600 MW | Cheshire Connection Node A 400kV Substation, United Kingdom | Haldane Energy Project 6 Limited | Online 30 Oct 2037 | NESO |
| Filed (source status: Scoping) | Bute Hydrogen Project 5 | Gas, combined cycle | 3,600 MW | Teeside Connection Node B, United Kingdom | Haldane Energy Project 5 Limited | Online 31 Oct 2035 | NESO |
| Filed (source status: Scoping) | Bute Hydrogen Project 3 | Gas, combined cycle | 3,600 MW | Grimsby West 400kV Substation, United Kingdom | Haldane Energy Project 3 Limited | Online 30 Oct 2035 | NESO |
| Filed (source status: Scoping) | Bute Hydrogen Project 2 | Gas, combined cycle | 3,600 MW | Creyke Beck 400kV Substation, United Kingdom | Haldane Energy Project 2 Limited | Online 30 Oct 2035 | NESO |
| Filed (source status: Scoping) | Hinkley Point C | Nuclear | 3,340 MW | Shurton 400kV Substation, United Kingdom | NNB Generation Company (HPC) Limited | Online 31 Mar 2029 | NESO |
| Filed (source status: Scoping) | Marram Wind Offshore Wind Farm | Offshore wind | 3,000 MW | Longside 400kV Substation, United Kingdom | Marramwind Limited | Online 31 Oct 2033 | NESO |
| Filed (source status: Scoping) | Hornsea Power Station 4 | Offshore wind | 2,600 MW | Creyke Beck 400kV Substation, United Kingdom | Orsted Hornsea Project Four Limited | Online 30 Oct 2028 | NESO |
| Filed (source status: Scoping) | Portwind | Solar + storage | 2,500 MW | Chickerell 400kV Substation, United Kingdom | SE Portwind Ltd | Online 6 Dec 2036 | NESO |
| Filed (source status: (L) Regulatory approvals pending. Not under construction) | Pepper Hammock Solar and Storage | Solar + storage | 2,500 MW | Wayne, GA | BrightNight Power | Online 1 Sep 2029 | EIA-860M |
| Filed (source status: Scoping) | Bute Hydrogen Project 7.1 | Storage | 2,400 MW | Solent Connection Node C 400kV, United Kingdom | Haldane Energy Project 7 Limited | Online 31 Oct 2038 | NESO |
| Filed (source status: Scoping) | Bute Hydrogen Project 4 | Gas, combined cycle | 2,400 MW | Teeside Connection Node 2 C 132/400kV Substation, United Kingdom | Haldane Energy Project 4 Limited | Online 30 Oct 2035 | NESO |
| Filed (source status: (L) Regulatory approvals pending. Not under construction) | Sunstone Solar | Solar + storage | 2,400 MW | Morrow, OR | Sunstone Solar, LLC | Online 1 Dec 2027 | EIA-860M |
| Filed (source status: Scoping) | OWPL Windfarm | Offshore wind | 2,250 MW | Banniskirk 400kV Substation, United Kingdom | Offshore Wind Power Limited | Online 31 Dec 2030 | NESO |
| Filed (source status: active) (status as of the file: MISO queue as of 31 December 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | J3996 | Gas, other | 2,220 MW | St. Charles, MO | — | Online 1 Jan 2030 | us.lbnl.queued_up |
| Filed (source status: Scoping) | Walpole Flexible Generation | Gas, combined cycle | 2,000 MW | Walpole 400kV Substation, United Kingdom | Flexible Generation 1 Ltd | Online 30 Jun 2033 | NESO |
| Filed (source status: Scoping) | Machair Offshore Wind Farm | Offshore wind | 2,000 MW | Machair 275/66kV Offshore Substation, United Kingdom | ScottishPower Renewables (UK) Limited | Online 16 Sep 2033 | NESO |
| Filed (source status: Scoping) | Gallos | Offshore wind | 2,000 MW | Alverdiscott 400kV Substation, United Kingdom | Corio Generation | Online 6 Dec 2036 | NESO |
| Filed (source status: Scoping) | Caledonia Offshore Wind Farm | Offshore wind | 2,000 MW | Greens 400kV Substation, United Kingdom | Caledonia Offshore Wind Farm Limited | Online 31 Oct 2032 | NESO |
| Filed (source status: (L) Regulatory approvals pending. Not under construction) | Deschutes Solar and BESS | Solar + storage | 2,000 MW | Wasco, OR | DECH bn, LLC | Online 1 Nov 2029 | EIA-860M |
| Filed (source status: Scoping) | North-East Offshore Hybrid Asset | Offshore wind | 1,800 MW | Kintore GSP, United Kingdom | National Grid Interconnector Holdings Limited | Online 30 Jun 2037 | NESO |
| Filed (source status: Scoping) | Glen Earrach PSH | Pumped hydro storage | 1,800 MW | Glen Earrach PSH 400kV substation, United Kingdom | Glen Earrach Energy Limited | Online 31 Oct 2035 | NESO |
| Filed (source status: Scoping) | Carrington Lane BESS | Storage | 1,800 MW | Daines 400kV Substation, United Kingdom | Apatura Battery Ltd | Online 30 Oct 2037 | NESO |
| Filed (source status: Scoping) | Berwick Bank Offshore Wind Farm C | Offshore wind | 1,800 MW | Blyth 400kV Substation, United Kingdom | Berwick Bank C Limited | Online 30 Nov 2029 | NESO |
| Filed (source status: Scoping) | Bellrock Offshore Wind Farm | Offshore wind | 1,800 MW | Hurlie 400kV substation, United Kingdom | Bellrock Offshore Wind Farm Limited | Online 31 Oct 2032 | NESO |
| Filed (source status: Scoping) | ARVEN OFFSHORE WIND FARM | Offshore wind | 1,800 MW | Northern Shetland 400kV Substation, United Kingdom | Arven Offshore Wind Farm Limited | Online 31 Oct 2033 | global.gem.gipt |
| Filed (source status: Scoping) | NatPower Enderby - Patford Bridge Green Energy Park | Storage | 1,799 MW | Derbyshire Connection Node G 400kV, United Kingdom | Enderby Energy Limited | Online 30 Oct 2037 | NESO |
| Filed (source status: Scoping) | Springwell | Solar + storage | 1,600 MW | Navenby 400kV Substation, United Kingdom | Springwell Energyfarm Limited | Online 1 Jun 2033 | NESO |
| Filed (source status: active) (status as of the file: MISO queue as of 31 December 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | J3999 | Gas, other | 1,540 MW | Vermillion, IN | — | Online 2 Jan 2030 | us.lbnl.queued_up |
| Filed (source status: (L) Regulatory approvals pending. Not under construction) | Bison Generation Station | Gas, combined cycle | 1,518 MW | Williams, ND | Basin Electric Power Coop | Online 1 Feb 2029 | EIA-860M |
| Filed (source status: active) (status as of the file: MISO queue as of 31 December 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | J4071 | Gas, other | 1,500 MW | Livingston Parish, LA | — | Online 30 Jun 2030 | us.lbnl.queued_up |
| Filed (source status: suspended) | Q320 | Wind | 1,500 MW | San Juan, NM | — | Online 30 Sep 2026 | us.lbnl.queued_up |
| Filed (source status: Scoping) | Torridge Offshore Wind Farm | Offshore wind | 1,500 MW | Torridge Offshore Substation, United Kingdom | Gwynt GLAS Offshore Wind Farm Limited | Online 31 Oct 2031 | NESO |
| Filed (source status: Scoping) | Stromar Offshore Windfarm | Offshore wind | 1,500 MW | Greens 400kV Substation, United Kingdom | Stromar Offshore Wind Farm Limited | Online 31 Oct 2033 | NESO |
| Filed (source status: Scoping) | SSE Celtic Sea 1 | Offshore wind | 1,500 MW | Alverdiscott 400kV Substation, United Kingdom | SSE Renewables Offshore Windfarm Holdings Limited | Online 6 Dec 2036 | NESO |
| Filed (source status: Scoping) | Phoenix 1B Offshore Wind Farm | Offshore wind | 1,500 MW | Near Branxton 400kV Substation, United Kingdom | Morven Offshore Wind Limited | Online 31 Oct 2033 | NESO |
| Filed (source status: Scoping) | Old Flatts Farm | Solar + storage | 1,500 MW | Brinsworth 400kV Substation, United Kingdom | Net Zero One Ltd | Online 30 Oct 2029 | NESO |
| Filed (source status: Scoping) | Nursling Flexible Generation | Gas, combined cycle | 1,500 MW | Nursling 400kV Substation, United Kingdom | South ENG Flexible Generation Limited | Online 30 Oct 2038 | NESO |
| Filed (source status: Scoping) | Morven A Offshore Wind Farm (Prev Phoenix 1A) | Offshore wind | 1,500 MW | Hawthorn Pit 400kV Substation, United Kingdom | Morven Offshore Wind Limited | Online 31 Oct 2031 | NESO |
| Filed (source status: Scoping) | Morgan Offshore Wind Farm | Offshore wind | 1,500 MW | Penwortham 400kV Substation, United Kingdom | Morgan Offshore Wind Limited | Online 30 Nov 2029 | NESO |
| Filed (source status: Scoping) | Mona Offshore Wind Farm | Offshore wind | 1,500 MW | Bodelwyddan 400kV Substation, United Kingdom | Mona Offshore Wind Limited | Online 31 Oct 2029 | NESO |
| Filed (source status: Scoping) | Merlin 2 Offshore Windfarm | Offshore wind | 1,500 MW | Alverdiscott 400kV Substation, United Kingdom | Offshore Wind Limited | Online 31 Oct 2031 | NESO |
| Filed (source status: Scoping) | Mablethorpe Storage | Gas, combined cycle | 1,500 MW | Lincolnshire Coastal Node 400kV Substation, United Kingdom | Theddlethorpe Flexible Generation Limited | Online 30 Nov 2031 | NESO |
| Filed (source status: Scoping) | Havbredey | Offshore wind | 1,500 MW | New Dounreay 400kV substation, United Kingdom | Havbredey Limited | Online 30 Oct 2033 | NESO |
| Filed (source status: Scoping) | GT R4 Offshore Wind Farm | Offshore wind | 1,500 MW | Weston Marsh 400kV Substation, United Kingdom | GT R4 Limited | Online 30 Nov 2030 | NESO |
| Filed (source status: active) (status as of the file: MISO queue as of 31 December 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | J4024 | Gas, other | 1,499 MW | Monroe, MI | — | Online 30 Sep 2030 | us.lbnl.queued_up |
| Filed (source status: active) (status as of the file: MISO queue as of 31 December 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | J4025 | Gas, other | 1,499 MW | Monroe, MI | — | Online 30 Sep 2030 | us.lbnl.queued_up |
| Filed (source status: active) (status as of the file: MISO queue as of 31 December 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | J3799 | Gas, other | 1,452 MW | Livingston, MI | — | Online 1 Apr 2030 | us.lbnl.queued_up |
| Filed (source status: Scoping) | Dogger Bank South West | Offshore wind | 1,450 MW | Birkhill Wood 400kV Substation, United Kingdom | RWE Renewables UK Dogger Bank South (West) Limited | Online 30 Nov 2031 | NESO |
Sources NESO · GEM · EIA-860M · Berkeley Lab
Supported by National Energy SO Open Data
Sources
- NESO Transmission Entry Capacity (TEC) RegisterSupported by National Energy SO Open Data
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.