Alliant Techsystems
Power plant · Oil
Key facts
Power plant · Oil Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1994
- Net generation, 2014
- -78 MWh
- Grid
- 14 kV to Northern States Power Co - Minnesota (MISO)
- Location
- Hennepin County, Minnesota
- Operated by
- Northern States Power Co - MinnesotaSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 32 years since 1994
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | MISO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- August 2015
- Capacity retired
- 1.6 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Petroleum Liquids | 1.6 MW | Retired | August 2015 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 14 kV
- Transmission or distribution system owner
- Northern States Power Co - Minnesota
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
Transmission lines within 25 km (10)
- Aldrich - St Louis Park 115 kV
- Parkers Lake - Blue Lake 345 kV
- Parkers Lake - Eden Prairie 345 kV
- Eden Prairie - Blue Lake 345 kV
- Aldrich 115 kV line
- Parkers Lake - Gleason Lake 115 kV
- Parkers Lake 345 kV line
- Parkers Lake - Dickinson 345 kV
- Westgate - Bluff Creek 115 kV
- West River Road - Riverside 115 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 1 scheduled to retire, 1.6 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| FIS GLOBAL Built | Large load | 1.6 km | |
| SUPERCOMPUTER LLC Built | Large load | 11.3 km | |
| FAIRVIEW DATA CENTER Built | Large load | 15.0 km | |
| OPTUM TECHNOLOGY Built | Large load | 15.3 km | |
| Blue Lake BESS Under construction | Storage | 15.8 km | 135.5 |
| DATA RECOGNITION CORP Built | Large load | 16.4 km | |
| Black Dog Postponed | Gas, combined cycle | 17.1 km | 760 |
| IRON GATE DATA CENTERS - EAGAN Built | Large load | 20.1 km | |
| DATABANK - EAGAN - MSP2 Built | Large load | 21.9 km | |
| TC Solar RCE Postponed | Solar | 22.3 km | 1 |
| OPTUM C/O UNITED HEALTH GROUP Built | Large load | 23.3 km | |
| HB FULLER CO - DATA CENTER - ARDEN HILLS Built | Large load | 23.5 km | |
| DATABANK MSP3 Built | Large load | 24.1 km | |
| EAGAN 5 MW DATA CENTER Built | Large load | 24.9 km |