Alliant Techsystems — Power plant · Oil · Northern States Power Co - MinnesotaFIS GLOBAL — Large load · MN · 1.6 km awaySUPERCOMPUTER LLC — Large load · MN · 11.3 km awayFAIRVIEW DATA CENTER — Large load · MN · 15.0 km awayOPTUM TECHNOLOGY — Large load · MN · 15.3 km awayBlue Lake BESS — Storage · MN · 135.5 MW · 15.8 km awayDATA RECOGNITION CORP — Large load · MN · 16.4 km awayBlack Dog — Gas, combined cycle · MN · 760 MW · 17.1 km awayIRON GATE DATA CENTERS - EAGAN — Large load · MN · 20.1 km awayDATABANK - EAGAN - MSP2 — Large load · MN · 21.9 km awayTC Solar RCE — Solar · MN · 1 MW · 22.3 km awayOPTUM C/O UNITED HEALTH GROUP — Large load · MN · 23.3 km awayHB FULLER CO - DATA CENTER - ARDEN HILLS — Large load · MN · 23.5 km awayDATABANK MSP3 — Large load · MN · 24.1 km awayEAGAN 5 MW DATA CENTER — Large load · MN · 24.9 km away
  • Combustion
  • Storage
  • Loads
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Alliant Techsystems

Power plant · Oil

Key facts

Power plant · Oil Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1994
Net generation, 2014
-78 MWh
Grid
14 kV to Northern States Power Co - Minnesota (MISO)
Location
Hennepin County, Minnesota
Operated by
Northern States Power Co - MinnesotaSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2003 to 2015
Fuel burned MMBtu by year, 2003 to 2015
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
32 years since 1994
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
August 2015
Capacity retired
1.6 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Petroleum Liquids1.6 MWRetiredAugust 2015

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
14 kV
Transmission or distribution system owner
Northern States Power Co - Minnesota
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 1 scheduled to retire, 1.6 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
FIS GLOBAL Built Large load 1.6 km
SUPERCOMPUTER LLC Built Large load 11.3 km
FAIRVIEW DATA CENTER Built Large load 15.0 km
OPTUM TECHNOLOGY Built Large load 15.3 km
Blue Lake BESS Under construction Storage 15.8 km 135.5
DATA RECOGNITION CORP Built Large load 16.4 km
Black Dog Postponed Gas, combined cycle 17.1 km 760
IRON GATE DATA CENTERS - EAGAN Built Large load 20.1 km
DATABANK - EAGAN - MSP2 Built Large load 21.9 km
TC Solar RCE Postponed Solar 22.3 km 1
OPTUM C/O UNITED HEALTH GROUP Built Large load 23.3 km
HB FULLER CO - DATA CENTER - ARDEN HILLS Built Large load 23.5 km
DATABANK MSP3 Built Large load 24.1 km
EAGAN 5 MW DATA CENTER Built Large load 24.9 km