Show on map
Brooklyn Hospital Center — Power plant · Oil · Brooklyn Hospital CenterNISA Electric Generation Project — Permitted · Storage · NY · 300 MW · 1.2 mi awayNISA Electric Generation Project — Postponed · Gas, combined cycle · NY · 92.5 MW · 1.2 mi awayGowanus Gas Turbines Generating — Postponed · Gas, combustion turbine · NY · 93 MW · 2.3 mi awayCDIL DATA CENTRE USA LLC — Built · Large load · NY · 2.5 mi awayBlue Aster B Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 4.2 mi awayBlue Aster Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 4.2 mi awayBlue Aster C Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 4.2 mi awayBensonhurst Energy Storage 1 LLC — Under construction · Storage · NY · 5 MW · 4.4 mi awayJamaica Community Energy, LLC — Under construction · Storage · NY · 4.9 MW · 4.5 mi awayRavenswood — Postponed · Storage · NY · 316 MW · 5.0 mi awayRoseate Tern Clean Energy LLC — Under construction · Storage · NY · 3.3 MW · 5.1 mi awayCYXTERA - NJ2X — Built · Large load · NJ · 5.5 mi awayHeron Clean Energy, LLC — Under construction · Storage · NY · 4.9 MW · 5.5 mi awayBayonne Energy Center — Under construction · Storage · NJ · 49.8 MW · 6.5 mi awayNJ TRANSITGRID — Postponed · Gas, combustion turbine · NJ · 136.1 MW · 7.1 mi awayCORESITE NY4 DATA CENTER — Under construction · Large load · NJ · 7.3 mi awayNew York University Central Plant — Under construction · Gas, combined cycle · NY · 5.5 MW · 7.4 mi awayEQUINIX — Built · Large load · NJ · 7.6 mi awayAstoria Gas Turbines — Postponed · Gas, combustion turbine · NY · 431 MW · 7.7 mi awayEQUINIX LLC — Built · Large load · NJ · 7.8 mi awayStaten Island Energy Storage 1 LLC — Postponed · Storage · NY · 5 MW · 8.1 mi awayLinden Clean Energy, LLC — Under construction · Storage · NY · 3.7 MW · 8.3 mi awayCoral Honeysuckle Clean Energy LLC — Under construction · Storage · NY · 3.7 MW · 8.3 mi awayRAR DEVELOPMENT ASSOCIATES — Built · Large load · NJ · 9.0 mi awayRAR DEVELOPMENT ASSOCIATES — Built · Large load · NJ · 9.1 mi awayLincoln Medical and Mental Health Center — Under construction · Oil · NY · 1 MW · 9.2 mi awayWintergreen C Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 9.6 mi awayWintergreen B Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 9.6 mi awayWintergreen D Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 9.6 mi awayWintergreen Clean Energy, LLC — Under construction · Storage · NY · 4.9 MW · 9.6 mi awayPrologis - SLNNJ036 - Community Solar — Under construction · Solar · NJ · 1.6 MW · 10.0 mi awayWater Willow A Clean Energy LLC — Under construction · Storage · NY · 3.9 MW · 10.5 mi awayWater Willow B Clean Energy LLC — Under construction · Storage · NY · 3.9 MW · 10.5 mi awayWarbler Clean Energy LLC — Under construction · Storage · NY · 2.3 MW · 10.6 mi awayPiping Plover Clean Energy, LLC — Under construction · Storage · NY · 2.3 MW · 10.6 mi awayKennedy International Airport Cogen — Postponed · Gas, combustion turbine · NY · 50 MW · 11.0 mi awayAB Newark Solar — Postponed · Solar · NJ · 5.6 MW · 11.2 mi awayElizabeth Metropolitan Logistics Center — Under construction · Solar · NJ · 1.2 MW · 12.0 mi awayLobelia Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 12.1 mi awayLobelia 4452 Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 12.1 mi awaySwiftsure — Postponed · Storage · NY · 121 MW · 12.6 mi awayCLIFTON DATA CENTER — Built · Large load · NJ · 13.0 mi awayElevate Arthur Kill — Under construction · Storage · NY · 15.1 MW · 13.5 mi awayBPL NJ - Union Distribution Center — Under construction · Solar · NJ · 1.5 MW · 13.9 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Brooklyn Hospital Center

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2004
Net generation, 2025
5 MWh
Grid
0.5 kV to Consolidated Edison Co-NY Inc (NYIS)
Location
Kings County, New York
Operated by
Brooklyn Hospital CenterSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2018 to 2025
Fuel burned MMBtu by year, 2018 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
22 years since 2004
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
SB
Mw
1.50
Units
3
Standby mw
1.50
Status rule
majority_mw_standby
In service mw
1.50
Out of service mw
0
Fuel burned (MMBtu), 2025336
Capacity factor, 20250.000
Net generation (MWh), 20255
Balancing authority codeNYIS
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 67200.0 outside 5000-30000 Btu/kWh

Retirement

Capacity retired
0.5 MW
Generators retired
1
Capacity still in service
1.5 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
SR4Petroleum Liquids0.5 MWRetiredSeptember 2022

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
0 kV
Transmission or distribution system owner
Consolidated Edison Co-NY Inc
Balancing authority
New York Independent System Operator
NERC region
NPCC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit SR4 scheduled to retire, 0.5 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
NISA Electric Generation Project × 2 units Permitted Storage 1.2 mi 392.5
Gowanus Gas Turbines Generating Postponed Gas, combustion turbine 2.3 mi 93
CDIL DATA CENTRE USA LLC Built Large load 2.5 mi
Blue Aster B Clean Energy LLC Under construction Storage 4.2 mi 4.9
Blue Aster Clean Energy LLC Under construction Storage 4.2 mi 4.9
Blue Aster C Clean Energy LLC Under construction Storage 4.2 mi 4.9
Bensonhurst Energy Storage 1 LLC Under construction Storage 4.4 mi 5
Jamaica Community Energy, LLC Under construction Storage 4.5 mi 4.9
Ravenswood Postponed Storage 5.0 mi 316
Roseate Tern Clean Energy LLC Under construction Storage 5.1 mi 3.3
CYXTERA - NJ2X Built Large load 5.5 mi
Heron Clean Energy, LLC Under construction Storage 5.5 mi 4.9
Bayonne Energy Center Under construction Storage 6.5 mi 49.8
NJ TRANSITGRID Postponed Gas, combustion turbine 7.1 mi 136.1
CORESITE NY4 DATA CENTER Under construction Large load 7.3 mi
New York University Central Plant Under construction Gas, combined cycle 7.4 mi 5.5
EQUINIX Built Large load 7.6 mi
Astoria Gas Turbines Postponed Gas, combustion turbine 7.7 mi 431
EQUINIX LLC Built Large load 7.8 mi
Staten Island Energy Storage 1 LLC Postponed Storage 8.1 mi 5
Linden Clean Energy, LLC Under construction Storage 8.3 mi 3.7
Coral Honeysuckle Clean Energy LLC Under construction Storage 8.3 mi 3.7
RAR DEVELOPMENT ASSOCIATES × 2 units Built Large load 9.0 mi
Lincoln Medical and Mental Health Center Under construction Oil 9.2 mi 1
Wintergreen C Clean Energy LLC Under construction Storage 9.6 mi 4.9
Wintergreen B Clean Energy LLC Under construction Storage 9.6 mi 4.9
Wintergreen D Clean Energy LLC Under construction Storage 9.6 mi 4.9
Wintergreen Clean Energy, LLC Under construction Storage 9.6 mi 4.9
Prologis - SLNNJ036 - Community Solar Under construction Solar 10.0 mi 1.6
Water Willow A Clean Energy LLC Under construction Storage 10.5 mi 3.9
Water Willow B Clean Energy LLC Under construction Storage 10.5 mi 3.9
Warbler Clean Energy LLC Under construction Storage 10.6 mi 2.3
Piping Plover Clean Energy, LLC Under construction Storage 10.6 mi 2.3
Kennedy International Airport Cogen Postponed Gas, combustion turbine 11.0 mi 50
AB Newark Solar Postponed Solar 11.2 mi 5.6
Elizabeth Metropolitan Logistics Center Under construction Solar 12.0 mi 1.2
Lobelia Clean Energy LLC Under construction Storage 12.1 mi 4.9
Lobelia 4452 Clean Energy LLC Under construction Storage 12.1 mi 4.9
Swiftsure Postponed Storage 12.6 mi 121
CLIFTON DATA CENTER Built Large load 13.0 mi
Elevate Arthur Kill Under construction Storage 13.5 mi 15.1
BPL NJ - Union Distribution Center Under construction Solar 13.9 mi 1.5

Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES

Sources

Attribution