El Cajon — Power plant · Gas, combustion turbine · NRG Cabrillo Power Ops IncEnerSmart El Cajon BESS — Postponed · Storage · CA · 3 MW · 2.8 mi awayEnerSmart Murray BESS — Postponed · Storage · CA · 21 MW · 3.0 mi awayAlvarado Hydro Facility — Postponed · Hydro · CA · 1.4 MW · 4.1 mi awayL3 Harris San Diego — Under construction · Solar · CA · 1.6 MW · 9.6 mi awayEnerSmart Mesa Heights Sub Station — Under construction · Storage · CA · 3 MW · 10.6 mi awayPomerado Energy Storage, LLC — Postponed · Storage · CA · 6 MW · 10.7 mi awayRancho Penasquitos — Under construction · Hydro · CA · 4.3 MW · 12.7 mi awayCA National City Terminal Ave — Under construction · Solar · CA · 1.1 MW · 13.0 mi away
  • Combustion
  • Clean firm
  • Wind & solar
  • Storage
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 1% of 2016 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1968
Net generation, 2016
801 MWh
Location
San Diego County, California
Operated by
NRG Cabrillo Power Ops IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2016
Fuel burned MMBtu by year, 2001 to 2016
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
58 years since 1968
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2016
Capacity retired
18 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
ENCINatural Gas Fired Combustion Turbine18 MWRetiredDecember 2016

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
CISO
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit ENCI scheduled to retire, 18 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
EnerSmart El Cajon BESS Postponed Storage 2.8 mi 3
EnerSmart Murray BESS Postponed Storage 3.0 mi 21
Alvarado Hydro Facility Postponed Hydro 4.1 mi 1.4
L3 Harris San Diego Under construction Solar 9.6 mi 1.6
EnerSmart Mesa Heights Sub Station Under construction Storage 10.6 mi 3
Pomerado Energy Storage, LLC Postponed Storage 10.7 mi 6
Rancho Penasquitos Under construction Hydro 12.7 mi 4.3
CA National City Terminal Ave Under construction Solar 13.0 mi 1.1