Grayson
Power plant · Storage
Key facts
Power plant · Storageran 1% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2004
- Net generation, 2025
- 14,434 MWh
- Grid
- 69 kV to City of Glendale - (CA) (LDWP)
- Location
- Los Angeles County, California
- Operated by
- City of Glendale - (CA)
Output
- Gas
- Biomass and waste
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Batteries”
- Age
- 22 years since 2004
- Heat rate
- 10,849 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 156,594 |
| Capacity factor, 2025 | 0.009 |
| Heat rate (Btu/kWh), 2025 | 10,849 |
| Net generation (MWh), 2025 | 14,434 |
| Balancing authority code | LDWP |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 296.5 MW
- Generators retired
- 9
- Capacity still in service
- 188.8 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 7 | Natural Gas Fired Combustion Turbine | 31 MW | Retired | November 2002 |
| 6 | Natural Gas Fired Combustion Turbine | 22 MW | Retired | March 2004 |
| 3 | Natural Gas Steam Turbine | 23 MW | Retired | March 2023 |
| 5 | Natural Gas Steam Turbine | 50 MW | Retired | April 2023 |
| 8A | Natural Gas Fired Combined Cycle | 25.4 MW | Retired | April 2023 |
| 1 | Natural Gas Fired Combined Cycle | 20 MW | Retired | May 2023 |
| 2 | Natural Gas Fired Combined Cycle | 20 MW | Retired | May 2023 |
| 4 | Natural Gas Steam Turbine | 50 MW | Retired | May 2023 |
| 8BC | Natural Gas Fired Combined Cycle | 55.1 MW | Retired | May 2023 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Natural Gas Steam Turbine | 123 MW | |
| Natural Gas Fired Combined Cycle | 120.5 MW | |
| Natural Gas Fired Combustion Turbine | 53 MW |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 69 kV
- Transmission or distribution system owner
- City of Glendale - (CA)
- Balancing authority
- Los Angeles Department of Water and Power
- NERC region
- WECC
Transmission lines within 25 km (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| City of Glendale - (CA) | Operator | EIA-860M | ||
| CITY OF GLENDALE CALIFORNIA | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- Stated Units 1, 2, 4, 8BC scheduled to retire, 145.1 MW · EIA-860M
- Stated Units 5, 8A scheduled to retire, 75.4 MW · EIA-860M
- Stated Unit 3 scheduled to retire, 23 MW · EIA-860M
- Stated Unit 6 scheduled to retire, 22 MW · EIA-860M
- In service · EIA-860M
- Stated Unit 7 scheduled to retire, 31 MW · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Scholl Canyon Under construction | Biomass | 7.9 km | 12 |
| Glenarm BESS Plant Filed | Storage | 12.4 km | 25 |
| LATTC South Campus Solar Postponed | Solar | 13.6 km | 1.1 |
| California Institute of Technology Postponed | Gas, combined cycle | 14.2 km | 16.5 |
| Foothill Solar Project Postponed | Solar | 14.5 km | 1.1 |
| PRIME DATA CENTER VERNON Built | Large load | 17.7 km | |
| AB Van Nuys Announced | Solar | 19.7 km | 1.6 |
| Bandini - SLLAX710 Under construction | Solar | 23.2 km | 1.3 |
| Van Norman Bypass Solar Project Postponed | Solar | 24.0 km | 2 |