Show on map
Greg Avenue — Power plant · Hydro · Metropolitan Water District of S CAFoothill Solar Project — Postponed · Solar · CA · 1.1 MW · 4.6 mi awayAB Van Nuys — Announced · Solar · CA · 1.6 MW · 7.2 mi awayVan Norman Bypass Solar Project — Postponed · Solar · CA · 2 MW · 9.4 mi awayScholl Canyon — Under construction · Biomass · CA · 12 MW · 9.8 mi awayGlenarm BESS Plant — Filed · Storage · CA · 25 MW · 12.9 mi awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 13.0 mi away20525 Nordhoff PV (North) — Under construction · Solar · CA · 1.9 MW · 13.2 mi awayCalifornia Institute of Technology — Postponed · Gas, combined cycle · CA · 16.5 MW · 13.8 mi away
  • Clean firm
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Greg Avenue

Power plant · Hydro

Key facts

Power plant · Hydro Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1979
Net generation, 2019
0 MWh
Grid
34 kV to Los Angeles Department of Water & Power (LDWP)
Location
Los Angeles County, California
Operated by
Metropolitan Water District of S CASourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2019

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
47 years since 1979
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeLDWP

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
March 2019
Capacity retired
1 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Hydroelectric1 MWRetiredMarch 2019

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
34 kV
Transmission or distribution system owner
Los Angeles Department of Water & Power
Balancing authority
Los Angeles Department of Water and Power
NERC region
WECC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 1 scheduled to retire, 1 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Foothill Solar Project Postponed Solar 4.6 mi 1.1
AB Van Nuys Announced Solar 7.2 mi 1.6
Van Norman Bypass Solar Project Postponed Solar 9.4 mi 2
Scholl Canyon Under construction Biomass 9.8 mi 12
Glenarm BESS Plant Filed Storage 12.9 mi 25
LATTC South Campus Solar Postponed Solar 13.0 mi 1.1
20525 Nordhoff PV (North) Under construction Solar 13.2 mi 1.9
California Institute of Technology Postponed Gas, combined cycle 13.8 mi 16.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution