HSCo CHP
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 79% of 2025 Retiring- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2009
- Net generation, 2025
- 27,669 MWh
- Grid
- 23 kV to Connecticut Light & Power Co (ISNE)
- Location
- Hartford County, Connecticut
- Operated by
- Cartier Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
- Owner
- Cartier Energy LLCSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 17 years since 2009
- Heat rate
- 13,805 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 381,978 |
| Capacity factor, 2025 | 0.790 |
| Heat rate (Btu/kWh), 2025 | 13,805.3 |
| Net generation (MWh), 2025 | 27,669 |
| Balancing authority code | ISNE |
Retirement
EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.- Next scheduled retirement
- October 2039
- Capacity scheduled to retire
- 4 MW
- Generators scheduled to retire
- 1
- Share of in-service capacity scheduled
- 100%
- Capacity still in service
- 4 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Natural Gas Fired Combustion Turbine | 4 MW | Scheduled to retire | October 2039 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 23 kV
- Transmission or distribution system owner
- Connecticut Light & Power Co
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
Transmission lines within 15 mi (10)
- North Bloomfield 345 kV line
- East New Britain 115 kV line
- Manchester 345 kV line
- Manchester - Barbour Hill 345 kV
- Millstone - Manchester 345 kV
- Manchester - Card 345 kV
- Manchester - Kleen 345 kV
- Ludlow - Barbour Hill 345 kV
- North Bloomfield - Agawam 345 kV
- North Bloomfield - Northeast Simsbury 115 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 1 scheduled to retire, 4 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Hartford Hospital Cogeneration Postponed | Gas, combustion turbine | 0.3 mi | 11.5 |
| Homestead Fuel Cell Postponed | Gas, other | 2.3 mi | 8.4 |
| NU - WETHERSFIELD DATA CENTER Built | Large load | 2.9 mi | |
| Dollar Tree Solar One Postponed | Solar | 10.8 mi | 2 |
| Windsor Locks Under construction | Solar | 11.6 mi | 1.8 |
| CT Airport Authority Solar One Announced | Solar | 11.9 mi | 4 |
| Ellington Solar One Postponed | Solar | 12.0 mi | 2 |
| Broadleaf Solar Filed | Solar | 12.7 mi | 200 |
Sources EIA-860M · EPA ICIS-Air