Loma Linda University Cogen — Power plant · Gas, combustion turbine · LOMA LINDA UNIVERSITYSunE Redlands — Postponed · Solar · CA · 1.5 MW · 1.7 mi awaySolar Photovoltaic Project #28 — Postponed · Solar · CA · 0.5 MW · 3.4 mi awayRedlands DC 9 - sline609 — Under construction · Solar + storage · CA · 5 MW · 3.4 mi awaySolar Photovoltaic Project #20 — Postponed · Solar · CA · 3.5 MW · 3.7 mi awayEnergy Center — Announced · Gas, combustion turbine · CA · 0.9 MW · 4.9 mi awaySolar Photovoltaic Project #24 — Postponed · Solar · CA · 4 MW · 7.2 mi awayCA Bloomington 2551 S Lilac Avenue Micro — Under construction · Solar + storage · CA · 3 MW · 7.4 mi awayCA Riverside 2356 Fleetwood Dr. — Under construction · Solar + storage · CA · 4 MW · 8.0 mi awayRCWMD Badlands Landfill Gas Project — Postponed · Biomass · CA · 1.2 MW · 9.5 mi awayOES Biogas Power — Under construction · Biomass · CA · 2.6 MW · 10.2 mi awaySolar Photovoltaic Project #30 — Postponed · Solar · CA · 1.5 MW · 10.2 mi awaySolar Photovoltaic Project #25 — Postponed · Solar · CA · 4.5 MW · 11.4 mi awaySolar Photovoltaic Project #27 — Postponed · Solar · CA · 1 MW · 11.4 mi awayAmazon - Moreno Valley — Postponed · Solar · CA · 2.2 MW · 12.3 mi awayPerris DC 5 - sline015 — Under construction · Solar · CA · 1.6 MW · 13.9 mi awaySolar Photovoltaic Project #17 — Postponed · Solar · CA · 0.5 MW · 14.7 mi awaySolar Photovoltaic Project #14 — Postponed · Solar · CA · 1.5 MW · 14.9 mi away
  • Combustion
  • Wind & solar
  • Bioenergy
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Loma Linda University Cogen

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 55% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1986
Net generation, 2025
63,575 MWh
Grid
66 kV to Southern California Edison Co (CISO)
Location
San Bernardino County, California
Operated by
Loma Linda UniversitySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Owner
Loma Linda UniversitySource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
40 years since 1986
Unused energy
51 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
13,353 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071159940
Subparts reported
C
NAICS code
611310
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001886
Eia status
By code
OP
Mw
10.40
Units
2
SB
Mw
2.70
Units
2
Standby mw
2.70
Status rule
some_units_retired
In service mw
13.10
Out of service mw
0
Fuel burned (MMBtu), 2025848,895
Capacity factor, 20250.554
Heat rate (Btu/kWh), 202513,352.7
Net generation (MWh), 202563,575
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
1.2 MW
Generators retired
1
Capacity still in service
13.1 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN3Natural Gas Fired Combined Cycle1.2 MWRetiredJuly 2014

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
66 kV
Transmission or distribution system owner
Southern California Edison Co
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit GEN3 scheduled to retire, 1.2 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SunE Redlands Postponed Solar 1.7 mi 1.5
Solar Photovoltaic Project #28 Postponed Solar 3.4 mi 0.5
Redlands DC 9 - sline609 Under construction Solar + storage 3.4 mi 5
Solar Photovoltaic Project #20 Postponed Solar 3.7 mi 3.5
Energy Center Announced Gas, combustion turbine 4.9 mi 0.9
Solar Photovoltaic Project #24 Postponed Solar 7.2 mi 4
CA Bloomington 2551 S Lilac Avenue Micro Under construction Solar + storage 7.4 mi 3
CA Riverside 2356 Fleetwood Dr. Under construction Solar + storage 8.0 mi 4
RCWMD Badlands Landfill Gas Project Postponed Biomass 9.5 mi 1.2
OES Biogas Power Under construction Biomass 10.2 mi 2.6
Solar Photovoltaic Project #30 Postponed Solar 10.2 mi 1.5
Solar Photovoltaic Project #25 Postponed Solar 11.4 mi 4.5
Solar Photovoltaic Project #27 Postponed Solar 11.4 mi 1
Amazon - Moreno Valley Postponed Solar 12.3 mi 2.2
Perris DC 5 - sline015 Under construction Solar 13.9 mi 1.6
Solar Photovoltaic Project #17 Postponed Solar 14.7 mi 0.5
Solar Photovoltaic Project #14 Postponed Solar 14.9 mi 1.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution