Show on map
Long Beach Generation — Power plant · Gas, combustion turbine · Long Beach Generation LLCElevate Pier S — Filed · Storage · CA · 70 MW · 0.1 km awayWatson Cogeneration — Withdrawn · Gas, combined cycle · CA · 94.2 MW · 6.1 km awaySan Pedro Public Market (SPPM) — Under construction · Solar · CA · 1.2 MW · 6.2 km awayDominguez - SLLAX512 — Under construction · Solar · CA · 1.3 MW · 8.5 km awaySouth Bay Dis Ctr 12 - SLLAX104 — Under construction · Solar · CA · 1.2 MW · 8.8 km awaySouth Bay Dis Ctr 6-SLLAX680 — Under construction · Solar · CA · 1.3 MW · 8.9 km awayFordyce - SLLAX680 — Under construction · Solar · CA · 1.3 MW · 8.9 km awayTorrance Dis Ctr 2 - SLLAX100 — Under construction · Solar · CA · 1.4 MW · 12.4 km awayWestminster Reliability Project, LLC — Under construction · Storage · CA · 110 MW · 19.7 km awayCobalt — Under construction · Solar + storage · CA · 250 MW · 21.9 km away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Long Beach Generation

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1976
Net generation, 2025
5,878 MWh
Grid
66 kV to Southern California Edison Co (CISO)
Location
Los Angeles County, California

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
50 years since 1976
Unused energy
2,202 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
17,361 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
ArcLight Capital Partners LLC
Share pct
50
Gem entity id
E100000001143
Name
ACH GP LLC
Share pct
25
Gem entity id
E100002022053
Name
ACHP II LP
Share pct
12.50
Gem entity id
E100002022052
Name
ACHP LP
Share pct
12.50
Gem entity id
E100002022051
Unit ids
G100000402310, G100000402311, G100000402312, G100000402313
Location id
L100000401590
Eia plant ids
341
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110035420112
Subparts reported
D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000490
Fuel burned (MMBtu), 2025102,048
Capacity factor, 20250.003
Heat rate (Btu/kWh), 202517,361
Net generation (MWh), 20255,878
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
335.4 MW
Generators retired
5
Capacity still in service
252 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
CT5Natural Gas Fired Combined Cycle63 MWRetiredDecember 2004
CT6Natural Gas Fired Combined Cycle63 MWRetiredDecember 2004
CT7Natural Gas Fired Combined Cycle63 MWRetiredDecember 2004
ST8Natural Gas Fired Combined Cycle80 MWRetiredDecember 2004
ST9Natural Gas Fired Combined Cycle66.4 MWRetiredDecember 2004

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
66 kV
Transmission or distribution system owner
Southern California Edison Co
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 25 km (10)
Connection points within 25 km (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

5 companies6
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Long Beach Generation LLC Operator EIA-860M
ARCLIGHT ENERGY PARTNERS FUND VII LP Owner 100.0% Dec 31, 2023 EPA GHGRP
Generation Bridge Acquisition Owner 100.0% Dec 31, 2025 EIA-860
Long Beach Generation LLC Owner Dec 31, 2025 EIA-860
NRG Energy, Inc Owner Dec 31, 2025 EIA-860
Vistra Corp Owner Dec 31, 2025 EIA-860

Timeline

  • Stated Units CT5, CT6, CT7, ST8, ST9 scheduled to retire, 335.4 MW · EIA-860M
  • In service · EIA-860M

Sources

8 sources

Sources EIA-860M · GEM · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Elevate Pier S Filed Storage 0.1 km 70
Watson Cogeneration Withdrawn Gas, combined cycle 6.1 km 94.2
San Pedro Public Market (SPPM) Under construction Solar 6.2 km 1.2
Dominguez - SLLAX512 Under construction Solar 8.5 km 1.3
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 8.8 km 1.2
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 8.9 km 1.3
Fordyce - SLLAX680 Under construction Solar 8.9 km 1.3
Torrance Dis Ctr 2 - SLLAX100 Under construction Solar 12.4 km 1.4
Westminster Reliability Project, LLC Under construction Storage 19.7 km 110
Cobalt Under construction Solar + storage 21.9 km 250

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 11, 2026Source: California ISO

Attribution