Magnolia: location and 8 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Magnolia
Power plant · Gas, steam turbine
Key facts
Power plant · Gas, steam turbineran 0% of 2003 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1949
- Net generation, 2003
- 1,391 MWh
- Location
- Los Angeles County, California
- Operated by
- City of Burbank Water and Power - (CA)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, steam turbine source: “Natural Gas Steam Turbine”
- Age
- 77 years since 1949
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- December 2003
- First unit retired
- February 2002
- Capacity retired
- 87.6 MW
- Generators retired
- 4
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| M3 | Natural Gas Steam Turbine | 20 MW | Retired | February 2002 |
| M4 | Natural Gas Steam Turbine | 34.5 MW | Retired | February 2002 |
| M2 | Natural Gas Fired Combined Cycle | 10 MW | Retired | September 2002 |
| M5 | Natural Gas Fired Combustion Turbine | 23.1 MW | Retired | December 2003 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Natural Gas Steam Turbine | 54.5 MW | |
| Natural Gas Fired Combustion Turbine | 23.1 MW | |
| Natural Gas Fired Combined Cycle | 10 MW |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- NERC region
- WECC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit M5 scheduled to retire, 23.1 MW · EIA-860M
- Stated Unit M2 scheduled to retire, 10 MW · EIA-860M
- Stated Units M3, M4 scheduled to retire, 54.5 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Foothill Solar Project Postponed | Solar | 6.8 mi | 1.1 |
| Scholl Canyon Under construction | Biomass | 7.2 mi | 12 |
| AB Van Nuys Announced | Solar | 9.7 mi | 1.6 |
| Glenarm BESS Plant Filed | Storage | 10.2 mi | 25 |
| LATTC South Campus Solar Postponed | Solar | 10.4 mi | 1.1 |
| California Institute of Technology Postponed | Gas, combined cycle | 11.2 mi | 16.5 |
| Van Norman Bypass Solar Project Postponed | Solar | 12.3 mi | 2 |
| PRIME DATA CENTER VERNON Built | Large load | 13.1 mi |
Sources EIA-860M · EPA ICIS-NPDES