Show on map
- Combustion
- Wind & solar
- Storage
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Under construction
- Operating
Masspower: location and 7 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Masspower
Power plant · Gas, combined cycle
Output
- Gas
- Oil
Details
Who’s behind it
- Owner
- Vistra Corp
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Age
- 33 years since 1993
- Unused energy
- 1,844 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 9,050 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 3,997,318 |
| Capacity factor, 2025 | 0.193 |
| Heat rate (Btu/kWh), 2025 | 9,049.8 |
| Net generation (MWh), 2025 | 441,701 |
| Balancing authority code | ISNE |
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Masspower | Operator | EIA-860M | ||
| Vistra Corp | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Palmer Renewable Energy Postponed | Biomass | 2.1 km | 42 |
| Stony Brook Postponed | Gas, combined cycle | 4.6 km | 422 |
| Chicopee BESS Under construction | Storage | 7.6 km | 5 |
| Riverside Holyoke Postponed | Hydro | 7.6 km | 1.1 |
| Hadley Falls Postponed | Hydro | 9.0 km | 3.5 |
| Holyoke MA BESS 1 Under construction | Storage | 10.5 km | 5 |
| Belchertown Solar PV + Battery Project Under construction | Solar + storage | 20.2 km | 5.6 |