MM Hartford Energy — Power plant · Biomass · DeltaPro Energy IncHartford Hospital Cogeneration — Postponed · Gas, combustion turbine · CT · 11.5 MW · 1.9 mi awayHomestead Fuel Cell — Postponed · Gas, other · CT · 8.4 MW · 2.5 mi awayNU - WETHERSFIELD DATA CENTER — Built · Large load · CT · 4.7 mi awayDollar Tree Solar One — Postponed · Solar · CT · 2 MW · 9.4 mi awayWindsor Locks — Under construction · Solar · CT · 1.8 MW · 10.0 mi awayCT Airport Authority Solar One — Announced · Solar · CT · 4 MW · 10.2 mi awayEllington Solar One — Postponed · Solar · CT · 2 MW · 10.3 mi awayBroadleaf Solar — Filed · Solar · CT · 200 MW · 11.6 mi away
  • Wind & solar
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

MM Hartford Energy

Power plant · Biomass

Key facts

Power plant · Biomassran 11% of 2018 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1998
Net generation, 2018
2,532 MWh
Location
Hartford County, Connecticut
Operated by
DeltaPro Energy IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2018
Fuel burned MMBtu by year, 2001 to 2018
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
28 years since 1998
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeISNE

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
July 2018
Capacity retired
2.7 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
UNT1Landfill Gas0.9 MWRetiredJuly 2018
UNT2Landfill Gas0.9 MWRetiredJuly 2018
UNT3Landfill Gas0.9 MWRetiredJuly 2018

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
ISNE
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units UNT1, UNT2, UNT3 scheduled to retire, 2.7 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Hartford Hospital Cogeneration Postponed Gas, combustion turbine 1.9 mi 11.5
Homestead Fuel Cell Postponed Gas, other 2.5 mi 8.4
NU - WETHERSFIELD DATA CENTER Built Large load 4.7 mi
Dollar Tree Solar One Postponed Solar 9.4 mi 2
Windsor Locks Under construction Solar 10.0 mi 1.8
CT Airport Authority Solar One Announced Solar 10.2 mi 4
Ellington Solar One Postponed Solar 10.3 mi 2
Broadleaf Solar Filed Solar 11.6 mi 200

Sources EIA-860M · EPA ICIS-Air

Sources