- Wind & solar
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Retired
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Retired
- Size not stated
MM Hartford Energy: location and 8 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
MM Hartford Energy
Power plant · Biomass
Key facts
Power plant · Biomassran 11% of 2018 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1998
- Net generation, 2018
- 2,532 MWh
- Location
- Hartford County, Connecticut
- Operated by
- DeltaPro Energy IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Biomass source: “Landfill Gas”
- Age
- 28 years since 1998
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | ISNE |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- July 2018
- Capacity retired
- 2.7 MW
- Generators retired
- 3
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| UNT1 | Landfill Gas | 0.9 MW | Retired | July 2018 |
| UNT2 | Landfill Gas | 0.9 MW | Retired | July 2018 |
| UNT3 | Landfill Gas | 0.9 MW | Retired | July 2018 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- ISNE
Transmission lines within 15 mi (10)
- North Bloomfield 345 kV line
- Manchester - Barbour Hill 345 kV
- Manchester 345 kV line
- Manchester - Kleen 345 kV
- Millstone - Manchester 345 kV
- Manchester - Card 345 kV
- East New Britain 115 kV line
- Ludlow - Barbour Hill 345 kV
- North Bloomfield - Agawam 345 kV
- North Bloomfield - Northeast Simsbury 115 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units UNT1, UNT2, UNT3 scheduled to retire, 2.7 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Hartford Hospital Cogeneration Postponed | Gas, combustion turbine | 1.9 mi | 11.5 |
| Homestead Fuel Cell Postponed | Gas, other | 2.5 mi | 8.4 |
| NU - WETHERSFIELD DATA CENTER Built | Large load | 4.7 mi | |
| Dollar Tree Solar One Postponed | Solar | 9.4 mi | 2 |
| Windsor Locks Under construction | Solar | 10.0 mi | 1.8 |
| CT Airport Authority Solar One Announced | Solar | 10.2 mi | 4 |
| Ellington Solar One Postponed | Solar | 10.3 mi | 2 |
| Broadleaf Solar Filed | Solar | 11.6 mi | 200 |
Sources EIA-860M · EPA ICIS-Air