Show on map
Overman Solar — Power plant · Solar · SunStrong Management, LLCRoady Lane Farm LLC — Postponed · Solar · NC · 74.8 MW · 1.0 mi awayBradley Farm (Dudley) — Postponed · Solar · NC · 5 MW · 1.1 mi awayStevens Mill Solar — Filed · Solar · NC · 80 MW · 4.6 mi awayCalypso Farm — Postponed · Solar · NC · 5 MW · 10.3 mi awayPanther Branch Solar, LLC — Filed · Solar + storage · NC · 112 MW · 11.6 mi awaySadie Solar — Postponed · Solar · NC · 5 MW · 12.2 mi awayWilfork Solar — Postponed · Solar · NC · 5 MW · 12.3 mi awayFaison Farm — Postponed · Solar · NC · 5 MW · 12.5 mi awayLongleaf Solar — Postponed · Solar · NC · 5 MW · 13.0 mi awaySignature Solar — Postponed · Solar · NC · 5 MW · 13.1 mi awayIcarus Solar — Postponed · Solar · NC · 3 MW · 13.5 mi awayFibroCoast — Postponed · Biomass · NC · 60 MW · 14.1 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Overman Solar

Power plant · Solar

Key facts

Power plant · Solarran 25% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
10,798 MWh
Grid
23 kV to Duke Energy Progress - (NC) (CPLE)
Location
Wayne County, North Carolina
Operated by
SunStrong Management, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001018943
Location id
L100001016956
Eia plant ids
66721
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
22.90
Transmission owner
Duke Energy Progress - (NC)
Balancing authority code
CPLE
Balancing authority name
Duke Energy Progress East
Fuel burned (MMBtu), 202536,844
Capacity factor, 20250.246
Net generation (MWh), 202510,798
Balancing authority codeCPLE

Solar array

Array area (acres)
34.5
AC capacity (MW)
5
DC capacity (MW)
7
Site type
Greenfield
Began operating
2021

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Roady Lane Farm LLC Postponed Solar 1.0 mi 74.8
Bradley Farm (Dudley) Postponed Solar 1.1 mi 5
Stevens Mill Solar Filed Solar 4.6 mi 80
Calypso Farm Postponed Solar 10.3 mi 5
Panther Branch Solar, LLC Filed Solar + storage 11.6 mi 112
Sadie Solar Postponed Solar 12.2 mi 5
Wilfork Solar Postponed Solar 12.3 mi 5
Faison Farm Postponed Solar 12.5 mi 5
Longleaf Solar Postponed Solar 13.0 mi 5
Signature Solar Postponed Solar 13.1 mi 5
Icarus Solar Postponed Solar 13.5 mi 3
FibroCoast Postponed Biomass 14.1 mi 60

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution