Pavlov — Power plant · Storage · HEN Infrastructure, L.L.C.Matagorda Clean Energy Center (BESS) — Storage · TX · 10.1 MW · 0.1 km awayDanish Fields Solar, LLC — Solar · TX · 602.8 MW · 9.4 km awayHecate Energy Ramsey Storage — Storage · TX · 500 MW · 11.4 km awayBlackcat BESS — Storage · TX · 200.6 MW · 12.9 km awayVentures BESS — Storage · TX · 238 MW · 13.1 km awayEldora Energy LLC — Solar + storage · TX · 402.2 MW · 14.3 km awayCity Breeze Energy Storage — Storage · TX · 143.1 MW · 15.3 km awayDuffy BESS — Storage · TX · 241.1 MW · 16.0 km awayErin — Solar · TX · 208.3 MW · 21.8 km awayFlag City Solar — Solar · TX · 167.3 MW · 23.8 km away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
-315 MWh
Grid
12 kV to AEP Texas Central Company (ERCO)
Location
Matagorda County, Texas

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
2 years since 2024
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
12.50
Transmission owner
AEP Texas Central Company
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-315
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -315.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Ownership

3 companies4
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
HEN Infrastructure, L.L.C. Operator EIA-860M
John Hancock Funding Company Owner 43.4% 31 Dec 2025 EIA-860
Manulife Infrastructure II Holdings A, L.P. Owner 53.2% 31 Dec 2025 EIA-860
HEN Infrastructure, L.L.C. Owner 3.4% 31 Dec 2025 EIA-860

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Matagorda Clean Energy Center (BESS) Under construction Storage 0.1 km 10.1
Danish Fields Solar, LLC Built Solar 9.4 km 602.8
Hecate Energy Ramsey Storage Contracted Storage 11.4 km 500
Blackcat BESS Studied Storage 12.9 km 200.6
Ventures BESS Studied Storage 13.1 km 238
Eldora Energy LLC Contracted Solar + storage 14.3 km 402.2
City Breeze Energy Storage Under construction Storage 15.3 km 143.1
Duffy BESS Under construction Storage 16.0 km 241.1
Erin Contracted Solar 21.8 km 208.3
Flag City Solar Postponed Solar 23.8 km 167.3

Sources EIA-860M · ERCOT

Sources

Attribution