Pioneer Valley Resource Recovery
Power plant · Waste to energy
Key facts
Power plant · Waste to energyran 34% of 2021 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1988
- Net generation, 2021
- 27,594 MWh
- Location
- Hampden County, Massachusetts
- Operated by
- Community Eco Springfield LLC
Output
- Gas
- Oil
- Biomass and waste
Details
Who’s behind it
Interested in this project?
- Technology
- Waste to energy source: “Municipal Solid Waste”
- Age
- 38 years since 1988
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | ISNE |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- April 2022
- Capacity retired
- 9.4 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| DLV1 | Municipal Solid Waste | 9.4 MW | Retired | April 2022 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- ISNE
Transmission lines within 15 mi (8)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| COMMUNITY ECO POWER LLC | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
| Community Eco Springfield LLC | Operator | EIA-860M |
Timeline
- Stated Unit DLV1 scheduled to retire, 9.4 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Palmer Renewable Energy Postponed | Biomass | 4.7 mi | 42 |
| Chicopee BESS Under construction | Storage | 5.8 mi | 5 |
| Holyoke MA BESS 1 Under construction | Storage | 6.1 mi | 5 |
| Riverside Holyoke Postponed | Hydro | 7.6 mi | 1.1 |
| Hadley Falls Postponed | Hydro | 8.4 mi | 3.5 |
| Stony Brook Postponed | Gas, combined cycle | 8.5 mi | 422 |
| CT Airport Authority Solar One Announced | Solar | 11.6 mi | 4 |
| Windsor Locks Under construction | Solar | 12.2 mi | 1.8 |
| Dollar Tree Solar One Postponed | Solar | 14.0 mi | 2 |
| Ellington Solar One Postponed | Solar | 14.5 mi | 2 |
Sources EIA-860M