Show on map
RCWMD Badlands Landfill Gas Project — Power plant · Biomass · Riverside County Waste Management DeptRCWMD Badlands Landfill Gas Project unit GEN2 — Postponed · Biomass · CA · 1.2 MW · 0.0 mi awayEnergy Center — Announced · Gas, combustion turbine · CA · 0.9 MW · 7.6 mi awayLake Perris Solar — Postponed · Solar · CA · 1.5 MW · 8.4 mi awaySan Jacinto Solar — Postponed · Solar · CA · 1.5 MW · 8.6 mi awayAmazon - Moreno Valley — Postponed · Solar · CA · 2.2 MW · 8.8 mi awayPerris DC 5 - sline015 — Under construction · Solar · CA · 1.6 MW · 9.7 mi awayRedlands DC 9 - sline609 — Under construction · Solar + storage · CA · 5 MW · 9.7 mi awaySolar Photovoltaic Project #20 — Postponed · Solar · CA · 3.5 MW · 10.1 mi awaySunE Redlands — Postponed · Solar · CA · 1.5 MW · 10.5 mi awaySolar Photovoltaic Project #28 — Postponed · Solar · CA · 0.5 MW · 12.7 mi away
  • Combustion
  • Wind & solar
  • Bioenergy
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

RCWMD Badlands Landfill Gas Project

Power plant · Biomass

Key facts

Power plant · Biomassran 54% of 2016 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2001
Net generation, 2016
6,208 MWh
Location
Riverside County, California
Operated by
Riverside County Waste Management DeptSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2017
Fuel burned MMBtu by year, 2001 to 2017
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
25 years since 2001
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
September 2017
Capacity retired
1.3 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Landfill Gas1.3 MWRetiredSeptember 2017

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
CISO
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit GEN1 scheduled to retire, 1.3 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
RCWMD Badlands Landfill Gas Project unit GEN2 Postponed Biomass 0.0 mi 1.2
Energy Center Announced Gas, combustion turbine 7.6 mi 0.9
Lake Perris Solar Postponed Solar 8.4 mi 1.5
San Jacinto Solar Postponed Solar 8.6 mi 1.5
Amazon - Moreno Valley Postponed Solar 8.8 mi 2.2
Perris DC 5 - sline015 Under construction Solar 9.7 mi 1.6
Redlands DC 9 - sline609 Under construction Solar + storage 9.7 mi 5
Solar Photovoltaic Project #20 Postponed Solar 10.1 mi 3.5
SunE Redlands Postponed Solar 10.5 mi 1.5
Solar Photovoltaic Project #28 Postponed Solar 12.7 mi 0.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution