RCWMD Badlands Landfill Gas Project
Power plant · Biomass
Key facts
Power plant · Biomassran 54% of 2016 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2001
- Net generation, 2016
- 6,208 MWh
- Location
- Riverside County, California
- Operated by
- Riverside County Waste Management DeptSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Biomass source: “Landfill Gas”
- Age
- 25 years since 2001
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | CISO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- September 2017
- Capacity retired
- 1.3 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN1 | Landfill Gas | 1.3 MW | Retired | September 2017 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- CISO
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit GEN1 scheduled to retire, 1.3 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| RCWMD Badlands Landfill Gas Project unit GEN2 Postponed | Biomass | 0.0 mi | 1.2 |
| Energy Center Announced | Gas, combustion turbine | 7.6 mi | 0.9 |
| Lake Perris Solar Postponed | Solar | 8.4 mi | 1.5 |
| San Jacinto Solar Postponed | Solar | 8.6 mi | 1.5 |
| Amazon - Moreno Valley Postponed | Solar | 8.8 mi | 2.2 |
| Perris DC 5 - sline015 Under construction | Solar | 9.7 mi | 1.6 |
| Redlands DC 9 - sline609 Under construction | Solar + storage | 9.7 mi | 5 |
| Solar Photovoltaic Project #20 Postponed | Solar | 10.1 mi | 3.5 |
| SunE Redlands Postponed | Solar | 10.5 mi | 1.5 |
| Solar Photovoltaic Project #28 Postponed | Solar | 12.7 mi | 0.5 |
Sources EIA-860M