Show on map
Sewaren — Power plant · Gas, combined cycle · Parkway Generation Sewaren Urban Renewal Entity LLCElevate Arthur Kill — Storage · NY · 15.1 MW · 5.6 km awaySwiftsure — Storage · NY · 121 MW · 7.0 km awayBARCLAYS CAPITAL DATA CENTER — Large load · NJ · 10.3 km awayCoreweave — Large load · NJ · 13.5 km awayPrologis - SLNNJ036 - Community Solar — Solar · NJ · 1.6 MW · 13.7 km awayBPL NJ - Union Distribution Center — Solar · NJ · 1.5 MW · 14.2 km awayStaten Island Energy Storage 1 LLC — Storage · NY · 5 MW · 14.5 km awayElizabeth Metropolitan Logistics Center — Solar · NJ · 1.2 MW · 14.7 km awayGateway Energy Center, LLC — Gas, combined cycle · NJ · 440 MW · 15.1 km awayMiddlesex Energy Center LLC — Gas, combined cycle · NJ · 570 MW · 15.3 km awayAB Newark Solar — Solar · NJ · 5.6 MW · 16.5 km awayBayonne Energy Center — Storage · NJ · 49.8 MW · 17.0 km awayBARCLAYS CAPITAL DATA CENTER — Large load · NJ · 17.9 km awayEVOQUE DATA CENTER SOLUTIONS - PNJ1 — Large load · NJ · 18.0 km awayMilltown Onsite BESS — Storage · NJ · 13.2 MW · 19.6 km awayNJ 1 DATA CENTER — Large load · NJ · 20.2 km awayPrologis - SLCNJ001 - Community Solar — Solar · NJ · 3.2 MW · 21.0 km awayRAR DEVELOPMENT ASSOCIATES — Large load · NJ · 21.3 km awayRAR DEVELOPMENT ASSOCIATES — Large load · NJ · 21.3 km awayGowanus Gas Turbines Generating — Gas, combustion turbine · NY · 93 MW · 23.7 km awayFIDESSA — Large load · NJ · 24.6 km away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 40% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
2,122,743 MWh
Grid
230 kV to Public Service Elec & Gas Co (PJM)
Location
Middlesex County, New Jersey

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
8 years since 2018
Unused energy
3,216 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
7,091 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000801614
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1005737
Fuel burned (MMBtu), 202515,052,034
Capacity factor, 20250.398
Heat rate (Btu/kWh), 20257,090.8
Net generation (MWh), 20252,122,743.1
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
567.4 MW
Generators retired
5
Capacity still in service
609.5 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
6Petroleum Liquids115.2 MWRetiredJune 2015
1Natural Gas Steam Turbine110.7 MWRetiredMay 2018
2Natural Gas Steam Turbine107.5 MWRetiredMay 2018
3Natural Gas Steam Turbine107.5 MWRetiredMay 2018
4Natural Gas Steam Turbine126.5 MWRetiredMay 2018
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Steam Turbine452.2 MW
Petroleum Liquids115.2 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
230 kV
Transmission or distribution system owner
Public Service Elec & Gas Co
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Parkway Generation Sewaren Urban Renewal Entity LLC Operator EIA-860M
ARCLIGHT ENERGY PARTNERS FUND VII LP Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units 1, 2, 3, 4 scheduled to retire, 452.2 MW · EIA-860M
  • In service · EIA-860M
  • Stated Unit 6 scheduled to retire, 115.2 MW · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Elevate Arthur Kill Under construction Storage 5.6 km 15.1
Swiftsure Postponed Storage 7.0 km 121
BARCLAYS CAPITAL DATA CENTER Built Large load 10.3 km
Coreweave Under construction Large load 13.5 km
Prologis - SLNNJ036 - Community Solar Under construction Solar 13.7 km 1.6
BPL NJ - Union Distribution Center Under construction Solar 14.2 km 1.5
Staten Island Energy Storage 1 LLC Postponed Storage 14.5 km 5
Elizabeth Metropolitan Logistics Center Under construction Solar 14.7 km 1.2
Gateway Energy Center, LLC Postponed Gas, combined cycle 15.1 km 440
Middlesex Energy Center LLC Postponed Gas, combined cycle 15.3 km 570
AB Newark Solar Postponed Solar 16.5 km 5.6
Bayonne Energy Center Under construction Storage 17.0 km 49.8
BARCLAYS CAPITAL DATA CENTER Built Large load 17.9 km
EVOQUE DATA CENTER SOLUTIONS - PNJ1 Built Large load 18.0 km
Milltown Onsite BESS Under construction Storage 19.6 km 13.2
NJ 1 DATA CENTER Built Large load 20.2 km
Prologis - SLCNJ001 - Community Solar Under construction Solar 21.0 km 3.2
RAR DEVELOPMENT ASSOCIATES × 2 units Built Large load 21.3 km
Gowanus Gas Turbines Generating Postponed Gas, combustion turbine 23.7 km 93
FIDESSA Built Large load 24.6 km