Smurfit Stone Los Angeles Mill: location and 14 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Smurfit Stone Los Angeles Mill
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 9% of 2002 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1985
- Net generation, 2002
- 35,614 MWh
- Location
- Los Angeles County, California
- Operated by
- Jefferson Smurfit Corp (US)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 41 years since 1985
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- September 2002
- Capacity retired
- 43.4 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Natural Gas Fired Combustion Turbine | 43.4 MW | Retired | September 2002 |
Grid
Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 1 scheduled to retire, 43.4 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- CAISOSource: California ISO
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| PRIME DATA CENTER VERNON Built | Large load | 0.5 mi | |
| LATTC South Campus Solar Postponed | Solar | 3.5 mi | 1.1 |
| Bandini - SLLAX710 Under construction | Solar | 5.1 mi | 1.3 |
| Glenarm BESS Plant Filed | Storage | 9.7 mi | 25 |
| CPA 3777 Workman Postponed | Solar | 10.5 mi | 1.9 |
| Scholl Canyon Under construction | Biomass | 10.9 mi | 12 |
| South Bay Dis Ctr 6-SLLAX680 Under construction | Solar | 10.9 mi | 1.3 |
| Fordyce - SLLAX680 Under construction | Solar | 10.9 mi | 1.3 |
| South Bay Dis Ctr 12 - SLLAX104 Under construction | Solar | 10.9 mi | 1.2 |
| California Institute of Technology Postponed | Gas, combined cycle | 11.0 mi | 16.5 |
| Dominguez - SLLAX512 Under construction | Solar | 11.1 mi | 1.3 |
| Torrance Dis Ctr 2 - SLLAX100 Under construction | Solar | 12.1 mi | 1.4 |
| Watson Cogeneration Withdrawn | Gas, combined cycle | 12.8 mi | 94.2 |
| Scattergood Postponed | Gas, combined cycle | 13.1 mi | 346 |
Sources EPA ICIS-NPDES · EIA-860M · CAISO