Valley (CA) — Power plant · Gas, combined cycle · Los Angeles Department of Water & PowerFoothill Solar Project — Solar · CA · 1.1 MW · 5.3 km awayAB Van Nuys — Solar · CA · 1.6 MW · 8.3 km awayVan Norman Bypass Solar Project — Solar · CA · 2 MW · 9.7 km away20525 Nordhoff PV (North) — Solar · CA · 1.9 MW · 17.5 km awayScholl Canyon — Biomass · CA · 12 MW · 20.8 km away
  • Combustion
  • Wind & solar
  • Bioenergy
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Valley (CA)

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 17% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2001
Net generation, 2025
1,039,599 MWh
Grid
230 kV, 138 kV to Los Angeles Department of Water & Power (LDWP)
Location
Los Angeles County, California

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
25 years since 2001
Unused energy
5,009 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
7,342 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110012444417
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001457
Fuel burned (MMBtu), 20257,632,410
Capacity factor, 20250.172
Heat rate (Btu/kWh), 20257,341.7
Net generation (MWh), 20251,039,599
Balancing authority codeLDWP

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
345.6 MW
Generators retired
2
Capacity still in service
690.5 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Natural Gas Steam Turbine172.8 MWRetiredDecember 2003
4Natural Gas Steam Turbine172.8 MWRetiredDecember 2003

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
230 kV, 138 kV
Transmission or distribution system owner
Los Angeles Department of Water & Power
Balancing authority
Los Angeles Department of Water and Power
NERC region
WECC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Los Angeles Department of Water & Power Operator EIA-860M
CITY OF LOS ANGELES CALIFORNIA Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units 3, 4 scheduled to retire, 345.6 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Foothill Solar Project Postponed Solar 5.3 km 1.1
AB Van Nuys Announced Solar 8.3 km 1.6
Van Norman Bypass Solar Project Postponed Solar 9.7 km 2
20525 Nordhoff PV (North) Under construction Solar 17.5 km 1.9
Scholl Canyon Under construction Biomass 20.8 km 12