Lerdo Detention Facility - Solar 2, 3 — Power plant · Solar · County of Kern - (CA)Lerdo Middle — Under construction · Solar · CA · 2.4 MW · 2.9 mi awayImperator Solar — Under construction · Solar · CA · 2 MW · 3.4 mi awayNorth Kern Water Storage District 2 — Postponed · Solar · CA · 2.5 MW · 3.9 mi awayKern Front — Postponed · Solar · CA · 18.9 MW · 3.9 mi awayNorth Kern Water Storage District 1 — Postponed · Solar · CA · 2.5 MW · 4.4 mi awayBakersfield Driver — Under construction · Solar + storage · CA · 2 MW · 6.3 mi awayRanch 4220 — Under construction · Solar · CA · 1.1 MW · 6.7 mi awayBolthouse Farms Fuel Cell — Postponed · Gas, other · CA · 5 MW · 14.9 mi away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

County of Kern - (CA)

Follow this company

Public agency

Key facts

Public agency · 5.2 MW
Assets
1
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2021 to 2025
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
20252,0162,016
20245,0875,087
20239,1759,175
20227,2667,266
2021 (part year)4,3004,300

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 1

Assets

1

Capacity

5.2 MW

MW by fuel
  1. Solar: 5.2 MW, 1 asset

Operates 1 power plant

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 8

within 15 mi

Projects

8

within 15 mi

Nearest

2.9 mi

Lerdo Middle

All 8NearbyShowing all 8 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Under construction Lerdo Middle Solar 2.4 MW 2.9 mi away nearest: Lerdo Detention Facility - Solar 2, 3
Under construction Imperator Solar Solar 2 MW 3.4 mi away nearest: Lerdo Detention Facility - Solar 2, 3
Postponed North Kern Water Storage District 2 Solar 2.5 MW 3.9 mi away nearest: Lerdo Detention Facility - Solar 2, 3
Postponed Kern Front Solar 18.9 MW 3.9 mi away nearest: Lerdo Detention Facility - Solar 2, 3
Postponed North Kern Water Storage District 1 Solar 2.5 MW 4.4 mi away nearest: Lerdo Detention Facility - Solar 2, 3
Under construction Bakersfield Driver Solar + storage 2 MW 6.3 mi away nearest: Lerdo Detention Facility - Solar 2, 3
Under construction Ranch 4220 Solar 1.1 MW 6.7 mi away nearest: Lerdo Detention Facility - Solar 2, 3
Postponed Bolthouse Farms Fuel Cell Gas, other 5 MW 14.9 mi away nearest: Lerdo Detention Facility - Solar 2, 3

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution