High Sierra Limited — Power plant · Gas, combustion turbine · WCAC Operating CompanyKern Front — Postponed · Solar · CA · 18.9 MW · 0.7 mi awayLerdo Middle — Under construction · Solar · CA · 2.4 MW · 7.4 mi awayNorth Kern Water Storage District 2 — Postponed · Solar · CA · 2.5 MW · 7.5 mi awayImperator Solar — Under construction · Solar · CA · 2 MW · 7.7 mi awayNorth Kern Water Storage District 1 — Postponed · Solar · CA · 2.5 MW · 8.3 mi awayRanch 4220 — Under construction · Solar · CA · 1.1 MW · 9.0 mi awayBakersfield Driver — Under construction · Solar + storage · CA · 2 MW · 10.3 mi awayBolthouse Farms Fuel Cell — Postponed · Gas, other · CA · 5 MW · 12.1 mi away
  • Combustion
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

High Sierra Ltd

Follow this company

Power plant owner

As filed: HIGH SIERRA LTD

Key facts

Power plant owner · 49.8 MW
Assets
1
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2025
  • Gas
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearGasTotal (MWh)
20255,5855,585
202414,10514,105
202323,32323,323
202243,22343,223
202119,65819,658
202021,97921,979
201916,79216,792
201828,05928,059
201724,53724,537
201610,65310,653
201552,76652,766
201429,04029,040
20138,7348,734
201213,52413,524
201139,15839,158
201044,47944,479
2009215,186215,186
2008405,247405,247
2007307,363307,363
2006331,534331,534
2005305,102305,102
2004397,129397,129
2003411,259411,259
2002393,531393,531
2001266,522266,522

Sources EIA-860M · EIA · EPA GHGRP

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EPA GHGRPOpen license · retrieved Nov 2, 2026

Attribution

Assets 1

Assets

1

Capacity

49.8 MW

MW by fuel
  1. Gas, combustion turbine: 49.8 MW, 1 asset

Owns 1 power plant

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Share Held by
High Sierra Limited Gas, combustion turbine Owns 49.8 MW US-CA 100.0% HIGH SIERRA LTD

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

Around this company

Nearby 8

within 15 mi

Projects

8

within 15 mi

Nearest

0.7 mi

Kern Front

All 8NearbyShowing all 8 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Kern Front Solar 18.9 MW 0.7 mi away nearest: High Sierra Limited
Under construction Lerdo Middle Solar 2.4 MW 7.4 mi away nearest: High Sierra Limited
Postponed North Kern Water Storage District 2 Solar 2.5 MW 7.5 mi away nearest: High Sierra Limited
Under construction Imperator Solar Solar 2 MW 7.7 mi away nearest: High Sierra Limited
Postponed North Kern Water Storage District 1 Solar 2.5 MW 8.3 mi away nearest: High Sierra Limited
Under construction Ranch 4220 Solar 1.1 MW 9.0 mi away nearest: High Sierra Limited
Under construction Bakersfield Driver Solar + storage 2 MW 10.3 mi away nearest: High Sierra Limited
Postponed Bolthouse Farms Fuel Cell Gas, other 5 MW 12.1 mi away nearest: High Sierra Limited

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution