Mt Poso Cogeneration — Power plant · Biomass · Mt Poso Cogeneration CoKern Front — Postponed · Solar · CA · 18.9 MW · 4.7 mi awayRanch 4220 — Under construction · Solar · CA · 1.1 MW · 7.6 mi awayLerdo Middle — Under construction · Solar · CA · 2.4 MW · 10.0 mi awayImperator Solar — Under construction · Solar · CA · 2 MW · 10.7 mi awayBakersfield Driver — Under construction · Solar + storage · CA · 2 MW · 11.0 mi awayNorth Kern Water Storage District 2 — Postponed · Solar · CA · 2.5 MW · 11.2 mi awayNorth Kern Water Storage District 1 — Postponed · Solar · CA · 2.5 MW · 11.8 mi awayRanch 4701 — Under construction · Solar · CA · 2.3 MW · 12.2 mi away
  • Bioenergy
  • Retired
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Macpherson Oil CO

Follow this company

Power plant owner

As filed: MACPHERSON OIL CO

Key facts

Power plant owner · 62 MW
Assets
1
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,120 of 50,273 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.0% of the output is from 0 plants recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2024
  • Bioenergy
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearBioenergyTotal (MWh)
2024179,693179,693
2023212,068212,068
2022148,792148,792
2021254,983254,983
2020294,376294,376
2019291,756291,756
2018255,054255,054
2017235,234235,234
2016258,203258,203
2015249,143249,143
2014257,523257,523
2013233,392233,392
2012199,611199,611
2011143,900143,900
2010298,412298,412
2009384,140384,140
2008410,087410,087
2007416,731416,731
2006426,600426,600
2005475,579475,579
2004456,900456,900
2003450,228450,228
2002439,618439,618
2001425,371425,371

Sources EIA-860M · EIA · EPA GHGRP

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EPA GHGRPOpen license · retrieved Nov 2, 2026

Attribution

Assets 1

Assets

1

Capacity

62.0 MW

MW by fuel
  1. Biomass: 62.0 MW, 1 asset

Owns 1 power plant

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 8

within 15 mi

Projects

8

within 15 mi

Nearest

4.7 mi

Kern Front

All 8NearbyShowing all 8 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Kern Front Solar 18.9 MW 4.7 mi away nearest: Mt Poso Cogeneration
Under construction Ranch 4220 Solar 1.1 MW 7.6 mi away nearest: Mt Poso Cogeneration
Under construction Lerdo Middle Solar 2.4 MW 10.0 mi away nearest: Mt Poso Cogeneration
Under construction Imperator Solar Solar 2 MW 10.7 mi away nearest: Mt Poso Cogeneration
Under construction Bakersfield Driver Solar + storage 2 MW 11.0 mi away nearest: Mt Poso Cogeneration
Postponed North Kern Water Storage District 2 Solar 2.5 MW 11.2 mi away nearest: Mt Poso Cogeneration
Postponed North Kern Water Storage District 1 Solar 2.5 MW 11.8 mi away nearest: Mt Poso Cogeneration
Under construction Ranch 4701 Solar 2.3 MW 12.2 mi away nearest: Mt Poso Cogeneration

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution