Fort Myers — Power plant · Gas, combined cycle · Florida Power & Light CoLauderdale — Power plant · Gas, combustion turbine · Florida Power & Light CoCape Canaveral — Power plant · Gas, combined cycle · Florida Power & Light CoPort Everglades — Power plant · Gas, combined cycle · Florida Power & Light CoSanford — Power plant · Gas, combined cycle · Florida Power & Light CoRiviera — Power plant · Gas, combined cycle · Florida Power & Light CoTurkey Point — Power plant · Nuclear · Florida Power & Light CoGulf Clean Energy Center — Power plant · Gas, steam turbine · Florida Power & Light CoLansing Smith — Power plant · Gas, combined cycle · Florida Power & Light CoWilliam F Wyman Hybrid — Power plant · Oil · FPL Energy Wyman LLCMartin — Power plant · Gas, combined cycle · Florida Power & Light CoManatee — Power plant · Gas, steam turbine · Florida Power & Light CoVictor J Daniel Jr — Power plant · Gas, combined cycle · Mississippi Power CoScherer — Power plant · Coal · Georgia Power CoPea Ridge — Power plant · Gas, combustion turbine · Florida Power & Light CoBellingham Cogeneration Facility — Power plant · Gas, combined cycle · Northeast Energy Associates LPOleander Power Project LP — Power plant · Gas, combustion turbine · Oleander Holdings LLCCurtis H Stanton Energy Center — Power plant · Gas, combined cycle · Stanton Clean Energy LLCWest County Energy Center — Power plant · Gas, combined cycle · Florida Power & Light CoOkeechobee Clean Energy Center — Power plant · Gas, combined cycle · Florida Power & Light CoSEGS VII — Power plant · Solar thermal · FPL Energy Operating Services Inc - SEGSSEGS V — Power plant · Solar thermal · FPL Energy Operating Services Inc - SEGSSEGS VI — Power plant · Solar thermal · FPL Energy Operating Services Inc - SEGSSEGS III — Power plant · Solar thermal · FPL Energy Operating Services Inc - SEGSSEGS IV — Power plant · Solar thermal · FPL Energy Operating Services Inc - SEGSTermosol 1 CSP solar farm — Power plant · Solar thermalTermosol 2 CSP solar farm — Power plant · Solar thermalEast Durham wind farm — Power plant · Wind · NextEra EnergyConestogo (Cordelio) wind farm — Power plant · Wind · NextEra EnergyPubnico Point wind farm — Power plant · Wind · NextEra EnergyAdelaide Wind Power Project — Power plant · Wind · NextEra EnergyMont Copper wind farm — Power plant · Wind · NextEra EnergyMont Miller wind farm — Power plant · Wind · NextEra EnergyBluewater wind farm — Power plant · Wind · NextEra EnergyAdelaide Wind Energy Centre — Power plant · Wind · NextEra EnergyBornish Wind Energy Centre — Power plant · Wind · NextEra EnergyGhost Pine wind farm — Power plant · Wind · NextEra EnergyCedar Point 2 wind farm — Power plant · Wind · NextEra EnergyGoshen wind farm — Power plant · Wind · NextEra EnergySummerhaven wind farm — Power plant · Wind · NextEra EnergyJericho wind farm — Power plant · Wind · NextEra EnergyMartin — Postponed · Gas, combined cycle · FL · 1,754 MW · 0.0 mi awayCurtis H Stanton Energy Center — Postponed · Coal · FL · 329 MW · 0.0 mi awayATT 911 Backbone (West Palm Beach data centre) — Built · Large load · FL · 6.1 mi awayKeene Branch Solar — Under construction · Solar · FL · 74.5 MW · 6.1 mi awaySmarr Combined Cycle Energy Facility — Announced · Gas, combined cycle · GA · 804 MW · 6.2 mi awayRumble Road Energy Center — Postponed · Gas, combined cycle · GA · 660 MW · 6.3 mi awayTaft BESS — Under construction · Storage · MA · 200 MW · 7.4 mi awayKENNEDY DATA CENTER — Built · Large load · FL · 7.7 mi awayData Center — Filed · Large load · FL · 7.9 mi awayLEE HEALTH LAB & DATA CENTER — Under construction · Large load · FL · 7.9 mi awayCADC PORTLAND 340, LLC — Built · Large load · ME · 8.3 mi awayVERIZON ORLANDO DATA CENTER — Built · Large load · FL · 8.3 mi awayTangelo — Under construction · Solar · FL · 74.5 MW · 9.3 mi awayVIERA DATA CENTER - PHASE 1 — Built · Large load · FL · 9.5 mi awayPerdido — Postponed · Biomass · FL · 1.6 MW · 9.9 mi awayCOMCAST MIRAMAR DATA CENTER — Under construction · Large load · FL · 10.4 mi awayAmbersweet — Under construction · Solar · FL · 74.5 MW · 11.0 mi awayOvernight Solar — Under construction · Solar + storage · CA · 150 MW · 11.2 mi awaySouth Portland ESS, LLC — Permitted · Storage · ME · 10 MW · 12.4 mi awayIron Mountain Data Center MIA-1 — Built · Large load · FL · 13.1 mi awayBig Bend III Battery Storage — Permitted · Storage · FL · 75 MW · 13.5 mi awayTampa Electric Co NA 3 — Postponed · Gas, combustion turbine · FL · 99 MW · 13.6 mi awayWESTBOROUGH DATA CENTER — Built · Large load · MA · 13.9 mi awaySorrento — Postponed · Solar · FL · 40 MW · 13.9 mi away
  • Combustion
  • Clean firm
  • Wind & solar
  • Operating
  • Retired
  • Other companies nearby
  • 10 · 100 · 1,000 MW

NextEra Energy

Follow this company

Power plant owner

Key facts

Power plant owner · 36,442.8 MW
Capacity held
36,442.8MW
Assets
41
Projects
1
States
CA, FL, GA, MA, ME, MS
Companies below
7
Headquarters
Juno Beach, United States Source: Wikidata
Listed
NYSE: NEE Source: SEC EDGAR
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

25 of 36 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 25 of 36 plants with a stake: US plants with an EIA monthly series.79% of the output is from 18 plants recorded as wholly owned.Not included: 5 plants it operates without a recorded stake.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2026
  • Gas
  • Coal
  • Oil
  • Nuclear
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearGasCoalOilNuclearSolarTotal (MWh)
2026 (part year)71,271,5476,024,588234,57712,487,463—90,018,175
2025101,216,0637,682,536137,59320,555,599—129,591,791
2024104,201,2797,033,94334,98821,358,851—132,629,061
2023104,503,3376,461,45339,26820,061,348—131,065,406
2022105,793,9097,301,784234,08920,793,348—134,123,130
2021106,102,1278,339,3125,90919,340,9390133,788,287
2020108,251,5145,633,63410,56719,004,4140132,900,128
2019107,228,23512,082,9635,94219,270,170121,531138,708,841
2018104,641,30115,420,443156,38619,812,430218,723140,249,283
2017100,873,50114,175,247106,35218,022,697229,720133,407,517
201697,736,63816,240,25592,32620,506,630259,681134,835,530
201599,025,35616,989,297485,68920,337,856279,031137,117,229
201493,421,94218,894,546253,18818,371,296285,711131,226,683
201385,701,21120,259,083199,64717,871,733301,150124,332,824
201291,997,87919,989,99659,06714,706,448387,625127,141,014
201177,170,59921,343,73487,37517,017,261400,279116,019,248
201087,176,29223,099,340159,83118,009,900377,895128,823,258
200980,541,06322,977,980236,92218,502,138414,159122,672,262
200879,182,06324,348,774168,80418,618,822369,111122,687,574
200785,500,84225,053,667379,80218,425,146334,307129,693,764
200688,131,83923,150,23567,64913,359,426299,325125,008,474
200585,333,92724,093,772883,88513,024,814302,837123,639,235
200472,726,53223,261,025686,98113,850,548375,767110,900,853
200371,855,24820,180,2801,235,22014,232,449397,332107,900,529
200269,738,84720,382,827407,83415,104,031459,537106,093,076
200176,031,66219,123,6791,106,65614,827,758444,657111,534,412

Sources GEM · EIA-860M · EIA · EPA GHGRP

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EPA GHGRPOpen license · retrieved Nov 2, 2026

Attribution

Sources 6

Registers

6

Reuse terms

  • 4 Open license
  • 2 Open license, with credit

Latest read

2026-11-13

From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.

Sources

  • EIA-860M ·

    EIA-860M Preliminary Monthly Electric Generator Inventory

    Open license · retrieved Nov 4, 2026

    US federal work — public domain

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • GEM ·

    Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

    Open license, with credit · retrieved Oct 26, 2026

    Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license

    In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • Berkeley Lab ·

    LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)

    Open license, with credit · retrieved Nov 4, 2026

    Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. · license

    Publication page https://eta-publications.lbl.gov/publications/queued-2026-edition-characteristics, retrieved 2026-10-23 (HTTP 200) — "Copyright Notice: The Queued Up data file is licensed CC BY 4.0. You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." and "Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. CC BY 4.0. All rights reserved." The file's Introduction sheet adds the DOE contract notice ("This dataset has been authored by an author at Lawrence Berkeley National Laboratory under Contract No. DE-AC02-05CH11231 with the U.S. Department of Energy ...") and the standard no-warranty disclaimer

    View at source →
  • Permitting Dashboard ·

    Federal Permitting Dashboard (FAST-41) full dataset — Socrata

    Open license · retrieved Nov 13, 2026

    public domain

    View at source →
  • Wikidata ·

    Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)

    Open license · retrieved Nov 4, 2026

    Source: Wikidata (CC0) · license

    Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • SEC EDGAR ·

    SEC EDGAR company tickers with exchange (company_tickers_exchange.json — CIK, EDGAR conformed name, ticker, exchange)

    Open license · retrieved Nov 4, 2026

    Source: U.S. Securities and Exchange Commission, EDGAR · license

    SEC website, "Privacy and Information Security" (https://www.sec.gov/about/privacy-information, read 2026-10-22), Website Dissemination: "Information presented on sec.gov is considered public information and may be copied or further distributed by users of the web site without the SEC’s permission. Please consider appropriate citation to the SEC as the source." SEC "Accessing EDGAR Data" (https://www.sec.gov/search-filings/edgar-search-assistance/accessing-edgar-data, read 2026-10-22): "Current max request rate: 10 requests/second."; "Please declare your user agent in request headers: Sample Declared Bot Request Headers: User-Agent: Sample Company Name AdminContact@<sample company domain>.com"; on this file: "We periodically update these files to provide functionality for EDGAR searches, but do not guarantee accuracy or scope." A compilation by a federal agency (17 U.S.C. §105).

    Summary only: the source’s license keeps the full record at the source.

    View at source →

Around this company

Nearby 24

within 15 mi (25 km outside the US)

Projects

24

within 15 mi (25 km outside the US)

Nearest

0.0 mi

Martin

All 24NearbyShowing all 24 nearby projects.

How these are matched

Exact-grade projects within 15 mi (25 km outside the US) of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi (25 km outside the US) of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Martin Gas, combined cycle 1,754 MW 0.0 mi away nearest: Martin
Postponed Curtis H Stanton Energy Center Coal 329 MW 0.0 mi away nearest: Curtis H Stanton Energy Center
Built ATT 911 Backbone (West Palm Beach data centre) Large load — 6.1 mi away nearest: Riviera
Under construction Keene Branch Solar Solar 74.5 MW 6.1 mi away nearest: Manatee
Announced Smarr Combined Cycle Energy Facility Gas, combined cycle 804 MW 6.2 mi away nearest: Scherer
Postponed Rumble Road Energy Center Gas, combined cycle 660 MW 6.3 mi away nearest: Scherer
Under construction Taft BESS Storage 200 MW 7.4 mi away nearest: Bellingham Cogeneration Facility
Built KENNEDY DATA CENTER Large load — 7.7 mi away nearest: Cape Canaveral
Filed Data Center Large load — 7.9 mi away nearest: Fort Myers
Under construction LEE HEALTH LAB & DATA CENTER Large load — 7.9 mi away nearest: Fort Myers
Built CADC PORTLAND 340, LLC Large load — 8.3 mi away nearest: William F Wyman Hybrid
Built VERIZON ORLANDO DATA CENTER Large load — 8.3 mi away nearest: Curtis H Stanton Energy Center
Under construction Tangelo Solar 74.5 MW 9.3 mi away nearest: Okeechobee Clean Energy Center
Built VIERA DATA CENTER - PHASE 1 Large load — 9.5 mi away nearest: Oleander Power Project LP
Postponed Perdido Biomass 1.6 MW 9.9 mi away nearest: Gulf Clean Energy Center
Under construction COMCAST MIRAMAR DATA CENTER Large load — 10.4 mi away nearest: Lauderdale
Under construction Ambersweet Solar 74.5 MW 11.0 mi away nearest: Okeechobee Clean Energy Center
Under construction Overnight Solar Solar + storage 150 MW 11.2 mi away nearest: SEGS V
Permitted South Portland ESS, LLC Storage 10 MW 12.4 mi away nearest: William F Wyman Hybrid
Built Iron Mountain Data Center MIA-1 Large load — 13.1 mi away nearest: Lauderdale
Permitted Big Bend III Battery Storage Storage 75 MW 13.5 mi away nearest: Manatee
Postponed Tampa Electric Co NA 3 Gas, combustion turbine 99 MW 13.6 mi away nearest: Manatee
Built WESTBOROUGH DATA CENTER Large load — 13.9 mi away nearest: Bellingham Cogeneration Facility
Postponed Sorrento Solar 40 MW 13.9 mi away nearest: Sanford

Sources EIA-860M · FAA OE/AAA · EPA ICIS-NPDES · EPA ICIS-Air · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 13, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026
  • CAISOOpen license, with credit · retrieved Nov 15, 2026Source: California ISO

Every source and license · Attribution