- Combustion
- Retired
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Combustion
- Retired
- Other companies nearby
3 assets
3 assets. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Roll Global
Power plant owner
Key facts
Power plant owner · 3.9 MW- Capacity held
- 3.9MW
- Assets
- 3
- States
- CA
- Headquarters
- Los Angeles, United States Source: Wikidata
- Website
- wonderful.com Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,118 of 50,271 companies here. Why
Gross output of plants with a stake
3 of 3 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 3 of 3 plants with a stake: US plants with an EIA monthly series.100% of the output is from 3 plants recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Gas
Yearly totals
| Year | Gas | Total (MWh) |
|---|---|---|
| 2024 | 0 | 0 |
| 2023 | 21,822 | 21,822 |
| 2022 | 21,712 | 21,712 |
| 2021 | 19,323 | 19,323 |
| 2020 | 11,579 | 11,579 |
| 2019 | 16,428 | 16,428 |
| 2018 | 23,367 | 23,367 |
| 2017 | 17,170 | 17,170 |
| 2016 | 20,105 | 20,105 |
| 2015 | 9,795 | 9,795 |
| 2014 | 14,852 | 14,852 |
| 2013 | 18,947 | 18,947 |
| 2012 (part year) | 2,474 | 2,474 |
Sources EIA-860 · EIA-860M · EIA
Sources
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
Assets 3
Assets
3
Capacity
3.9 MW
- Gas, other: 3.9 MW, 3 assets
Owns 3 power plants
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Share | Held by |
|---|---|---|---|---|---|---|
| Roll Delano 2 | Gas, other | Owns | 1.6 MW | US-CA | 100.0% | Roll Global |
| Roll Delano | Gas, other | Owns | 1.2 MW | US-CA | 100.0% | Roll Global |
| Roll Lost Hills | Gas, other | Owns | 1.1 MW | US-CA | 100.0% | Roll Global |
Sources 2
Registers
2
Reuse terms
- 2 Open license
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 11
within 25 kmProjects
11
within 25 km
Nearest
0.9 km
Solar Photovoltaic Project #46
All 11NearbyShowing all 11 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Postponed | Solar Photovoltaic Project #46 | Solar | 3.5 MW | 0.9 km away | nearest: Roll Delano 2 |
| Postponed | Solar Photovoltaic Project #35 | Solar | 7 MW | 1.4 km away | nearest: Roll Delano 2 |
| Under construction | Pistachio Road 1726-WD | Solar | 4.8 MW | 6.1 km away | nearest: Roll Lost Hills |
| Under construction | Ranch 4701 | Solar | 2.3 MW | 14.1 km away | nearest: Roll Delano |
| Under construction | Chalan | Solar + storage | 64.9 MW | 14.3 km away | nearest: Roll Lost Hills |
| Announced | Gardenia 1 | Solar + storage | 6 MW | 15.4 km away | nearest: Roll Lost Hills |
| Under construction | Ranch 4220 | Solar | 1.1 MW | 16.9 km away | nearest: Roll Delano |
| Under construction | Pelicans Jaw Hybrid Solar | Solar + storage | 678.5 MW | 18.2 km away | nearest: Roll Lost Hills |
| Postponed | Chevron - Lost Hills Hybrid | Storage | 10 MW | 18.4 km away | nearest: Roll Lost Hills |
| Under construction | Bakersfield Driver | Solar + storage | 2 MW | 19.4 km away | nearest: Roll Delano |
| Contracted | Rexford 2 Solar Farm | Solar + storage | 200 MW | 22.2 km away | nearest: Roll Delano 2 |
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- CAISO Public Queue ReportSource: California ISO