- Combustion
- Clean firm
- Wind & solar
- Storage
- In development
- Under construction
- Operating
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Combustion
- Clean firm
- Wind & solar
- Storage
- In development
- Under construction
- Operating
- Other companies nearby
47 assets · 3 projects
47 assets · 3 projects. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Not on this map: 5 projects: placed by county or state, a license that withholds the site, or a stage the map draws no dot for (withdrawn, canceled, frozen or not stated). Each is in its tab below.
5 outside this view, drawn where they are: zoom out to see them.
TransAlta Corp
Power plant owner
Key facts
Power plant owner · 3,924.9 MW- Capacity held
- 3,924.9MW
- Assets
- 47
- Projects
- 8
- States
- NC
- Companies below
- 3
- Headquarters
- Calgary, Canada Source: Wikidata
- Website
- transalta.com Source: Wikidata
- Listed
- NYSE: TAC Source: SEC EDGAR
- LEI
- GJZNVO2UY6DNFNIYH321 Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why
Gross output of plants with a stake
15 of 47 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 15 of 47 plants with a stake: US plants with an EIA monthly series.100% of the output is from 15 plants recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Solar
Yearly totals
| Year | Solar | Total (MWh) |
|---|---|---|
| 2025 | 99,740 | 99,740 |
| 2024 | 93,732 | 93,732 |
| 2023 | 103,409 | 103,409 |
| 2022 | 119,084 | 119,084 |
| 2021 (part year) | 105,108 | 105,108 |
Sources GEM · EIA-860 · EIA-860M · EIA
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIA-860
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
Projects 8
Capacity
6.20 GW
0.71 GW active
Assets 47
Assets
47
Capacity
3,925 MW
- Wind: 1,416 MW, 15 assets
- Gas, combined cycle: 1,137 MW, 6 assets
- Hydro: 504 MW, 4 assets
- Gas, combustion turbine: 354 MW, 2 assets
- Storage: 268 MW, 3 assets
- Other: 246 MW, 17 assets
Operates 17 power plants · Owns 47 power plants
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Ownership 4
Companies
4
this one included
Parents
0
Subsidiaries
3
direct
Assets are what each company holds itself. A dash: this view does not show it; the company’s own page does.
-
TransAlta Corp This company 60 assets8,170.1 MWwith the companies below
-
Far North Power Corp Subsidiary · share not stated 2 assets230 MW
-
Heartland Generation Ltd Subsidiary · share not stated 9 assets2,614 MW
-
TransAlta Generation Partnership Subsidiary · share not stated 2 assets1,401.2 MW
-
The same companies as a table, with each ownership claim
| Company. Sort by company, A to Z | Relationship, sorted ascending. Sort by relationship, subsidiaries first | Assets. Sort by assets held, largest first | Asset types |
|---|---|---|---|
| TransAlta Corp | This company | 47 | power plant |
| Far North Power Corp | Subsidiary | — | — |
| Heartland Generation Ltd | Subsidiary | — | — |
| TransAlta Generation Partnership | Subsidiary | — | — |
Sources 4
Registers
4
Reuse terms
- 3 Open license
- 1 Open license, with credit
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
-
View at source →
SEC EDGAR ·
SEC EDGAR company tickers with exchange (company_tickers_exchange.json — CIK, EDGAR conformed name, ticker, exchange)
Source: U.S. Securities and Exchange Commission, EDGAR · license
SEC website, "Privacy and Information Security" (https://www.sec.gov/about/privacy-information, read 2026-10-22), Website Dissemination: "Information presented on sec.gov is considered public information and may be copied or further distributed by users of the web site without the SEC’s permission. Please consider appropriate citation to the SEC as the source." SEC "Accessing EDGAR Data" (https://www.sec.gov/search-filings/edgar-search-assistance/accessing-edgar-data, read 2026-10-22): "Current max request rate: 10 requests/second."; "Please declare your user agent in request headers: Sample Declared Bot Request Headers: User-Agent: Sample Company Name AdminContact@<sample company domain>.com"; on this file: "We periodically update these files to provide functionality for EDGAR searches, but do not guarantee accuracy or scope." A compilation by a federal agency (17 U.S.C. §105).
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 49
within 15 mi (25 km outside the US)Projects
49
within 15 mi (25 km outside the US)
Nearest
0.0 km
Kent Hills wind farm RP1
All 49NearbyShowing all 49 nearby projects. They fill 48 rows, as a project's generator units share a row.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Under construction | Kent Hills wind farm RP1 | Wind | 96 MW | 0.0 km away | nearest: Kent Hills wind farm |
| Postponed | Dobbins Mill Farm | Solar | 5 MW | 0.7 mi away | nearest: 1009 Yadkin Solar |
| Postponed | Olin Creek Farm Solar | Solar | 35 MW | 0.7 mi away | nearest: 1045 Tomlin Mill Solar |
| Announced | Port Hedland solar farm 2 | Solar | 45 MW | 1.4 km away | nearest: South Hedland power station |
| Under construction | Kent Hills wind farm RP2 | Wind | 54 MW | 3.0 km away | nearest: Kent Hills wind farm |
| Postponed | Onslow Energy | Solar | 1.5 MW | 2.7 mi away | nearest: 1034 Catherine Lake Solar, LLC |
| Under construction | East Windsor cogeneration centre 2 | Gas, combustion turbine | 100 MW | 4.6 km away | nearest: Windsor Essex power station |
| Postponed | Calypso Farm | Solar | 5 MW | 2.9 mi away | nearest: Solar Lee, LLC |
| Canceled | Windy Point wind farm (Canada) -- | Wind | 51 MW | 5.2 km away | nearest: Summerview wind farm |
| Announced | St. Clair Energy Centre 3 | Gas, combustion turbine | 245 MW | 5.3 km away | nearest: Sarnia cogeneration plant |
| Postponed | FibroHills | Biomass | 60 MW | 3.3 mi away | nearest: 1001 Ebenezer Church Solar |
| Postponed | Round Hill PV1 | Solar | 5 MW | 4.5 mi away | nearest: 1009 Yadkin Solar |
| Announced | Willow Ridge wind farm -- | Wind | 196 MW | 7.8 km away | nearest: Mcbride Lake wind farm |
| Postponed | Faison Farm | Solar | 5 MW | 4.9 mi away | nearest: Solar Lee, LLC |
| Filed | Panther Branch Solar, LLC | Solar + storage | 112 MW | 5.0 mi away | nearest: Solar Lee, LLC |
| Postponed | Crimson Solar | Solar | 5 MW | 5.1 mi away | nearest: 1034 Catherine Lake Solar, LLC |
| Postponed | Wilfork Solar | Solar | 5 MW | 5.3 mi away | nearest: Suncaster, LLC |
| Filed | Black Walnut Solar, LLC | Solar + storage | 112 MW | 7.0 mi away | nearest: Plott Hound Solar |
| Announced | Beacon Data Centers Heartland Project 1 | Gas, reciprocating engine | 920 MW | 11.7 km away | nearest: Fort Saskatchewan power station |
| Under construction | Dill Holdings LLC | Solar | 10 MW | 7.4 mi away | nearest: 1045 Tomlin Mill Solar |
| Postponed | FibroCoast | Biomass | 60 MW | 7.8 mi away | nearest: Solar Lee, LLC |
| Postponed | Roady Lane Farm LLC | Solar | 74.8 MW | 8.4 mi away | nearest: Solar Lee, LLC |
| Postponed | Bradley Farm (Dudley) | Solar | 5 MW | 8.5 mi away | nearest: Solar Lee, LLC |
| Under construction | Baxter Creek Solar × 2 units | Solar | 60 MW | 8.7 mi away | nearest: Carolina Lily Solar |
| Under construction | City of Detroit Castle Solar | Solar | 10 MW | 14.1 km away | nearest: Windsor Essex power station |
| Postponed | Duroc Holdings | Solar | 5 MW | 9.0 mi away | nearest: Carolina Lily Solar |
| Postponed | Wayfair Solar | Solar | 2 MW | 9.7 mi away | nearest: Acme Solar, LLC |
| Postponed | Battle Solar | Solar | 2 MW | 9.7 mi away | nearest: Acme Solar, LLC |
| Under construction | Eastern Power Hydrogen Ready Power Plant Project 2 | Gas, combined cycle | 300 MW | 16.1 km away | nearest: Sarnia cogeneration plant |
| Under construction | Eastern Power Hydrogen Ready Power Plant Project 1 | Gas, combined cycle | 300 MW | 16.1 km away | nearest: Sarnia cogeneration plant |
| Announced | Timber Mill Solar | Solar + storage | 112 MW | 10.7 mi away | nearest: Swansboro Solar, LLC |
| Permitted | City of Detroit Greenfield | Solar | 7 MW | 17.7 km away | nearest: Windsor Essex power station |
| Postponed | Angus Holdings | Solar | 5 MW | 11.1 mi away | nearest: Solar Lee, LLC |
| Postponed | Icarus Solar | Solar | 3 MW | 11.4 mi away | nearest: Suncaster, LLC |
| Postponed | Innovative Solar 72 | Solar | 33.5 MW | 11.6 mi away | nearest: Acme Solar, LLC |
| Postponed | Innovative Solar 38 | Solar | 34 MW | 11.7 mi away | nearest: Solar Lee, LLC |
| Filed | Stevens Mill Solar | Solar | 80 MW | 12.0 mi away | nearest: Solar Lee, LLC |
| Under construction | St. Ives Gold Mine solar farm -- | Solar | 35 MW | 20.0 km away | nearest: Southern Cross power station |
| Postponed | Wilkes Solar, LLC | Solar | 75 MW | 12.5 mi away | nearest: 1051 Lucky Solar, LLC |
| Under construction | Warsaw 2 Energy Storage | Storage | 11 MW | 12.6 mi away | nearest: Solar Lee, LLC |
| Postponed | Signature Solar | Solar | 5 MW | 13.6 mi away | nearest: Suncaster, LLC |
| Under construction | Midfield Solar, LLC | Solar | 25 MW | 13.7 mi away | nearest: Acme Solar, LLC |
| Postponed | Sadie Solar | Solar | 5 MW | 14.1 mi away | nearest: Suncaster, LLC |
| Announced | St. Ives Gold Mine wind farm -- | Wind | 42 MW | 23.0 km away | nearest: Southern Cross power station |
| Postponed | MP Wilson LLC | Biomass | 2.2 MW | 14.6 mi away | nearest: Suncaster, LLC |
| Postponed | Whiteville Solar 2 | Solar | 5 MW | 15.0 mi away | nearest: Acme Solar, LLC |
| Announced | Riverside Solar LLC | Solar | 100 MW | 24.7 km away | nearest: Wolfe Island wind farm |
| Under construction | Trenton Channel Energy Center | Storage | 220 MW | 24.8 km away | nearest: Windsor Essex power station |
Sources GEM · EIA-860M · Berkeley Lab
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIA-860M
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.